Skill set Outline

Date retreived
23/07/2026 2:51 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Tram or Light Rail Turnout Construction Skill Set

Tram or Light Rail Turnout Construction Skill Set

Skill set
National Code
TLISS00146
State Code
AD254
TGA Status
Replaced
DTWD Status
Transition (Replaced)
National Endorsed, State Implementation and Classification
This Skill Set is for individuals who are required to construct turnouts for tram or light rail systems.
AQF Level
Field of Education
Skillset Type
National
Original TGA Release Date
19/10/2015
Current Release Date
19/10/2015
Current Release Number
1.00
Approved Date
22/12/2017
Transition Date
29/01/2022
Nominal Hours
Duration
1 Semester
Releases
Release Version Release Date TGA Status DTWD Status
1.00 19/10/2015 Current Approved
Pathway Information
The TLISS00146 Tram or Light Rail Turnout Construction Skill Set is part of the TLI Transport and Logistics Training Package.
This Skill Set is only to be undertaken in addition to the TLI22215 Certificate II in Tram or Light Rail Infrastructure.
Licensing / Regulatory Information
The TLISS00146 Tram or Light Rail Turnout Construction Skill Set is part of the TLI Transport and Logistics Training Package.
This Skill Set is only to be undertaken in addition to the TLI22215 Certificate II in Tram or Light Rail Infrastructure.
Skill Set Entry Requirements
A Current Qualification Release or associated Course does not exist.
Target Group
People interested in a role required to construct tram or light rail turnouts who have a TLI22215 Certificate II in Tram or Light Rail Infrastructure.
Suggested words for statement of attainment
This TLISS00146 Tram or Light Rail Turnout Construction Skill Set from the TLI Transport and Logistics Training Package meets the industry requirements for individuals who work within the tram or light rail infrastructure environment and are required to construct turnouts.
General notes
Schedule
State Code National Code Title Hours Type
AVH63 TLIS3040 Construct concrete or steel points and crossings 20 Unit of competency
Replaced By
State Code National Code Title Type
AE480 TLISS00211 Tram or Light Rail Turnout Construction Skill Set Skill set