Unit of competency Outline

Date retreived
23/07/2026 11:30 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manage testing of games and interactive media

Manage testing of games and interactive media

Unit of competency
National Code
ICAGAM511A
State Code
D7815
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
18/07/2011
State Implementation and Classification
Approved Date
04/11/2011
Field of Education
100799 - Communication And Media Studies, N.e.c.
Original Release Date
04/11/2011
Nominal Hours
30
Description
This unit describes the performance outcomes, skills and knowledge required to manage the testing of games and interactive media to enable timely product release.
Notes
Elements and Performance Criteria
1. Determine quality requirements statement which will enable product release
  • 1.1 Review picture of product in market place to determine high-level requirements provided by product, for expected clients, considering all types of requirements
  • 1.2 Define a releasable product in terms of outstanding bugs, to enable a limited release and a complete product release
  • 1.3 Summarise findings into a product release enabling quality requirements statement
  • 1.4 Confirm client and development, agreement on product release enabling quality requirements statement
2. Define test plan to enable testing of required quality as defined by agreed quality requirements statement
  • 2.1 Determine expected test cycles, during the software development life cycle, considering what development methodology is in use and what the quality requirements are for product release
  • 2.2 Determine what types of testing will be performed during the test cycles to enable efficiency of processes and confirmation of quality requirements statement
  • 2.3 Determine what testing methods will be used to implement testing types defined for defined test cycles
  • 2.4 Determine testing technique to be used to determine test cases and analyse results
  • 2.5 Perform test cycle until a combination is found that provides an acceptable balance of cost, quality and risk, for upper management and development to agree to
  • 2.6 Selection test-support software to enable efficiency in testing and testing management
  • 2.7 Define implementation details for agreed testing and team responsible for testing management
  • 2.8 Define reporting details for testing throughout product life cycle to enable ongoing management of testing process
  • 2.9 Confirm test plan completeness using available completeness techniques
  • 2.10 Confirm test plan with development and management
3. Install and configure test plan defined test support software
  • 3.1 Install and configure bug tracking process and define bug description fields to maximise efficiency and minimise possibilities of bouncing bugs
  • 3.2 Install and configure test case management software
  • 3.3 Install and configure test cycle management and reporting software
  • 3.4 Install and configure automated test tools
4. Manage testing process to enable defined quality requirements
  • 4.1 Manage and report on development of test cases
  • 4.2 Manage and report on test cycle status
  • 4.3 Manage and report on outstanding bug status
  • 4.4 Manage and report on status of product testing related to product release enabling quality requirements statement
  • 4.5 Update test plan and schedule to deal with changing development conditions, and ensure management are informed
  • 4.6 Manage bugs to ensure efficient bug handling and resolution
  • 4.7 Manage test environment, including setup, receipt of test builds and clean-up
5. Finalise testing for release
  • 5.1 Produce testing results for management review prior to release
  • 5.2 Manage test product freeze for final release and final test run
  • 5.3 Confirm product, release enabling, and quality requirements have been met
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Types of requirements may include:
functional, such as audio and visual
installation, such as new, upgrades, database and software
non-functional, such as performance, load, stress and cultural
platform or environment.
Outstanding bugs may include:
defined priorities
with or without defined priorities.
Limited release may include:
alpha and beta release options
environment-specific release
internal or in-house release options
external release options
platform-specific release.
Test cycles may include:
delivery of testable product to client
delivery of testable product to test team
in-development tests, such as source-code updates or retrievals from source control, initial implementation complete time, pre-implementation time.
Types of testing may include:
acceptance
data functionality
functionality
graphical user interface (GUI)
load
performance
regression
smoke
stress
unit.
Testing methods may include:
automated, such as coded testing or using automation-tool
manual, such as exploratory or testing of specific test cases
static and dynamic analysis.
Testing technique may include:
boundary value analysis
equivalence
way of designing test cases.
Test-support software may include:
bug tracking software
test automation software, such as:
WinRunner
LoadRunner
test case-management software, such as Test Director.
Implementation details and reporting details may include:
communication and interaction levels between departments for cycles, such as development may or may not be approachable during particular processes or cycles
details of all processes and procedures
required documentation repositories, templates, structures and locations.
Completeness techniques may include:
interdepartmental reviews
intradepartmental reviews
system dissection.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
define quality requirements and an associated test plan for software
install and configure testing support software
manage testing process
identify bugs or issues accurately and concisely
finalise software testing process to enable product release.
Context of and specific resources for assessment
Assessment must ensure access to:
system undergoing development with associated specifications
client requirements (verbal or written) for system quality requirements
testing support software
test environment
appropriate learning and assessment support when required
modified equipment for people with special needs.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of candidate identifying or finding bugs and issues
review of reports prepared by candidate showing plans and management of testing.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, where appropriate.
Assessment processes and techniques must be culturally appropriate, and suitable to the communication skill level, language, literacy and numeracy capacity of the candidate and the work being performed.
Indigenous people and other people from a non-English speaking background may need additional support.
In cases where practical assessment is used it should be combined with targeted questioning to assess required knowledge.
Replaced By
State Code National Code Title Type
AUT87 ICTGAM511 Manage testing of games and interactive media Unit of competency