Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Assemble and erect transmission structures
Assemble and erect transmission structures
Unit of competency
National Code
UETDRTO015
UETDRTO015
State Code
ODZ71
ODZ71
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
09/09/2022
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
09/09/2022
Nominal Hours
45
Description
This unit involves the skills and knowledge required for the assembly and erection of transmission structures in the electricity supply industry (ESI).It includes the assembly and erection of transmission structures in accordance with construction plans, drawings and workplace requirements.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace. Other conditions may also apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to assemble and erect transmission structures
- 1.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed
- 1.2 Work plan is obtained and confirmed in accordance with workplace requirements
- 1.3 Materials required for work are determined and obtained in accordance with work plan and workplace requirements
- 1.4 Plant, tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
- 1.5 Hazards are identified, risks are assessed and control measures identified and applied
- 1.6 Safety observer role and responsibilities are discussed and confirmed in accordance with workplace requirements
- 1.7 Communication method between the workers and safety observer is determined and confirmed in accordance with workplace requirements
- 1.8 Safe approach distances for the work to be performed are determined and confirmed in accordance with workplace requirements
- 1.9 Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements
- 1.10 Work permits are signed in accordance with workplace requirements
- 1.11 Worksite is prepared in accordance with the work plan and workplace requirements
2 Carry out the assembly and erection of transmission structures
- 2.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
- 2.2 Lifting, working at heights and the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements
- 2.3 Hazard control measures are monitored in accordance with workplace requirements
- 2.4 Safety observer is positioned to observe the work in accordance with workplace requirements
- 2.5 Communication methods between workers and safety observer are used in accordance with workplace requirements
- 2.6 Safe approach distances are maintained when the work is being performed in accordance with workplace requirements
- 2.7 Transmission structures are assembled and erected in accordance with construction plans, drawings and workplace requirements
- 2.8 Incidents or unplanned events are responded to in accordance with workplace requirements
- 2.9 Quality checks of work are undertaken in accordance with work plan and workplace requirements
3 Complete the work
- 3.1 Completed work is checked for compliance against the work plan and workplace requirements
- 3.2 Incidents or unplanned events are reported in accordance with workplace requirements
- 3.3 Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements
- 3.4 Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements
- 3.5 Surplus materials are returned to storage or disposed of in accordance with workplace requirements
- 3.6 Work permits are signed off in accordance with workplace requirements
- 3.7 Personnel are notified of work completion in accordance with workplace requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODN66 | UETDRTO002 | Erect power systems transmission structures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHR3 | UET20422 | Certificate II in Transmission Line Construction | Qualification |