Unit of competency Outline
Date retreived
23/07/2026 1:21 AM AWST
23/07/2026 1:21 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Control cane traffic movements
Control cane traffic movements
Unit of competency
National Code
FDFSUG302A
FDFSUG302A
State Code
WD863
WD863
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
31/07/2014
Field of Education
039907 - Rail Operations
Original Release Date
31/07/2014
Nominal Hours
45
Description
This unit describes the outcomes required to control movements on the cane railway delivery/transport network to ensure safe train separation, efficient running of the traffic system and continuous, fresh supply of cane to the mill. It may also include controlling truck movements.
Notes
Elements and Performance Criteria
1 Prepare for operation
- 1.1 Participate in shift handover process to identify status and occurrences affecting traffic control
- 1.2 Confirm status of traffic activities on the cane railway network and in the empty and full yards
- 1.3 Establish communication with drivers, crews and other relevant personnel
- 1.4 Housekeeping standards are maintained
2 Implement schedule
- 2.1 Train movement instructions are issued to maintain safe operations
- 2.2 The communication system is used to provide timely information to relevant personnel
3 Issue train clearances to maintain train separation
- 3.1 Clearance instructions are issued
- 3.2 Point-to-point clearances are issued
4 Maintain train separation
- 4.1 Access to the rail network is controlled, including access by drivers, navvies, contractors, harvesting crews and other third parties
- 4.2 Train passing is arranged and co-ordinated in accordance with workplace procedures
- 4.3 Transportation movements are managed using rail network procedures and systems
5 Maintain efficient running
- 5.1 Transport departures and arrivals are co-ordinated and adjusted
- 5.2 Train running times are monitored and opportunities to improve efficiency are identified and acted upon
- 5.3 Train loads are maximized within load limits
- 5.4 Train passing is managed to minimize delays and maintain safe operations
- 5.5 Overall operating efficiencies are monitored and optimised
6 Complete traffic control operations
- 6.1 Train movements and related workplace information is recorded according to workplace recording requirements
- 6.2 Recording systems and advice reflects accurate information at the time of handover
- 6.3 Handover is carried out according to workplace procedure
- 6.4 Traffic controllers are aware of system and related equipment status at completion of handover
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Policies and procedures
Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements.
Codes of Practice
Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations.
Workplace information
Workplace information can include:
master schedule
daily schedule
bin allotments
mill crushing rate
harvesting roster
train running slips
maintenance advice
Network systems
Network systems can include
block sections and check points
multiple trains in block
mimic board
train graphs
control sheets.
Traffic movement information
This is done at commencement of shift and may include use of verbal advice, log books, incident reports, mimic boards and related documentation.
Factors impacting on traffic scheduling
Factors can include:
mill status and current crush rate
next planned mill stop
timing of crib breaks
availability of empty bins, taking into account mixed bin fleet if appropriate
availability of full-yard space
availability of empty-yard space
contractor/harvester rates
siding status
track infrastructure condition
rolling stock condition
transport schedule amendments
Workplace information
Information provided includes
instructions
running information including schedule changes for pickups and deliveries
maintenance status including location of non-operational locomotives and damaged bins
other hazards and all other information affecting cane transportation operations
Teamwork
Work may require the ability to work within a team environment.
Communication methods
Communication methods include use of two-way radios used in accordance with workplace requirements and state authority protocols.
Policies and procedures
Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements.
Codes of Practice
Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations.
Workplace information
Workplace information can include:
master schedule
daily schedule
bin allotments
mill crushing rate
harvesting roster
train running slips
maintenance advice
Network systems
Network systems can include
block sections and check points
multiple trains in block
mimic board
train graphs
control sheets.
Traffic movement information
This is done at commencement of shift and may include use of verbal advice, log books, incident reports, mimic boards and related documentation.
Factors impacting on traffic scheduling
Factors can include:
mill status and current crush rate
next planned mill stop
timing of crib breaks
availability of empty bins, taking into account mixed bin fleet if appropriate
availability of full-yard space
availability of empty-yard space
contractor/harvester rates
siding status
track infrastructure condition
rolling stock condition
transport schedule amendments
Workplace information
Information provided includes
instructions
running information including schedule changes for pickups and deliveries
maintenance status including location of non-operational locomotives and damaged bins
other hazards and all other information affecting cane transportation operations
Teamwork
Work may require the ability to work within a team environment.
Communication methods
Communication methods include use of two-way radios used in accordance with workplace requirements and state authority protocols.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment must be carried out in a manner that recognises the cultural and literacy requirements of the assessee and is appropriate to the work performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of ability to:
receive information on status of traffic movements and occurrences
confirm status of traffic movements
operate communication systems to provide advice to personnel
demonstrate procedures for controlling train movements
apply procedure to calculate efficient loads
maintain workplace records
prepare for and conduct handover
Context of and specific resources for assessment
Assessment must occur in a real or simulated workplace where the assessee has access to:
Transport system and associated information and communication systems and equipment
Relevant codes of practice and industry standards
Workplace information required to determine and monitor safe traffic movements on the cane transport network. This includes provision of a traffic schedule against which to assess, adjust and monitor work progress against schedule
Operating procedures related to work responsibilities
Housekeeping standards and procedures
Workplace information recording systems, requirements and procedures
Method of assessment
Other units of competency relevant to the work role should be assessed in conjunction with this unit.
Guidance information for assessment
To ensure consistency in one's performance, competency should be demonstrated on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and where possible, over a number of assessment activities.
Overview of assessment
Assessment must be carried out in a manner that recognises the cultural and literacy requirements of the assessee and is appropriate to the work performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of ability to:
receive information on status of traffic movements and occurrences
confirm status of traffic movements
operate communication systems to provide advice to personnel
demonstrate procedures for controlling train movements
apply procedure to calculate efficient loads
maintain workplace records
prepare for and conduct handover
Context of and specific resources for assessment
Assessment must occur in a real or simulated workplace where the assessee has access to:
Transport system and associated information and communication systems and equipment
Relevant codes of practice and industry standards
Workplace information required to determine and monitor safe traffic movements on the cane transport network. This includes provision of a traffic schedule against which to assess, adjust and monitor work progress against schedule
Operating procedures related to work responsibilities
Housekeeping standards and procedures
Workplace information recording systems, requirements and procedures
Method of assessment
Other units of competency relevant to the work role should be assessed in conjunction with this unit.
Guidance information for assessment
To ensure consistency in one's performance, competency should be demonstrated on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and where possible, over a number of assessment activities.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AYL33 | SUGTCCT3A | Control cane traffic movements | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAN74 | FBPSUG3002 | Control cane traffic movements | Unit of competency |