Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Trip pipe
Trip pipe
Unit of competency
National Code
RIIOGD303F
RIIOGD303F
State Code
OBW63
OBW63
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
05/03/2021
Field of Education
030303 - Mining Engineering
Original Release Date
05/03/2021
Nominal Hours
25
Description
This unit describes the skills and knowledge required to apply trip pipe in drilling.This unit applies to those working in operational roles. They generally perform tasks involving a broad range of skilled applications in a wide variety of contexts, which may involve some discretion and judgement in selecting equipment, services and contingency measures.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for operations
- 1.1 Obtain, interpret and confirm work requirements
- 1.2 Access, interpret and apply trip pipe documentation and confirm work activity is compliant
- 1.3 Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures
- 1.4 Select and wear personal protective equipment required for work activity
- 1.5 Communicate with other personnel at site according to work requirements and confirm briefings and handover details are communicated and received
- 1.6 Confirm availability and status of necessary permits to work according to operational and legislative requirements
- 1.7 Confirm availability of necessary third party utilities according to operational requirements
2. Prepare to trip tubulars
- 2.1 Check safety lines, ropes and air hoists/winch lines
- 2.2 Check equipment for safety and operations
- 2.3 Line up trip tank if applicable to equipment in use
- 2.4 Prepare pipe racking system
3. Trip and rack tubulars
- 3.1 Assist in tripping in and out using required techniques based on the lifting equipment and tripping method used
- 3.2 Rack and store tubular based on the lifting equipment and tripping method used
- 3.3 Record tasks where required
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWB85 | RIIOGD303E | Trip pipe | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFI4 | RII32020 | Certificate III in Drilling Oil & Gas (Onshore) | Qualification |