Unit of competency Outline

Date retreived
22/07/2026 9:24 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Shape solid stone

Shape solid stone

Unit of competency
National Code
CPCCST3002A
State Code
W9557
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040309 - Bricklaying And Stonemasonry
Original Release Date
20/06/2014
Nominal Hours
8
Description
This unit specifies the outcomes required to shape stone using a range of methods for shaping to provide stone to required specifications.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement.
  • 1.5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied.
2. Use various hand working methods for shaping dimensional stone.
  • 2.1. Stone is dressed using each tool according to correct application and in appropriate sequence to specification.
  • 2.2. Soft stone is cut accurately to squared sizes as required by job.
  • 2.3. Hard stone is dressed using hammers and axes.
3. Use various power-assisted hand tools for shaping dimensional stone.
  • 3.1. Range of percussion hammers and chisels is used to shape stone at different stages of processing as required by job.
  • 3.2. Rotary, chain and/or oscillating saws are used to cut stone to size and shape as required by job.
  • 3.3. Abrasive machines are used to dress stone surfaces as required by job.
  • 3.4. Equipment is operated in conjunction with jigs and guides for repetitive and fine tolerance work as required by job.
  • 3.5. Adjustments are made to machinery, as required, in accordance with stone and application processes.
4. Set up and operate static machinery for shaping dimensional stone.
  • 4.1. Circular diamond saws are operated to cut squared blocks and operated with rise and fall functions for cutting to profiles as required by job.
  • 4.2. Stone is shaped on lathes both between centres and facework as required by job.
  • 4.3. Core drilling machinery is operated as required by job.
  • 4.4. Moulded sections are shaped on planing machines as required by job.
  • 4.5. Water-jet cutting machinery is operated as required by job.
5. Clean up work.
  • 5.1. Work is cleaned on completion with fresh water and brushes if necessary.
  • 5.2. Waste materials are disposed of in an appropriate manner and in accordance with Environment Protection Authority (EPA) requirements.
  • 5.3. Finished stone surfaces are protected as required by job specification.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
material safety data sheets (MSDS)
memos
regulatory and legislative requirements pertaining to handling stone
relevant Australian standards
safe work procedures relating to handling stone
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
concealed services (water, power and gas)
control of dust and noise
lighting
restricted access barriers
traffic control
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment used to shape stone include:
axes
bush hammers
chisels
patent axes
poky
spalling hammers.
Quality requirements include:
attention to specifications of work
control of handling procedures
relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications where specified
workplace operations and procedures
use and maintenance of equipment.
Materials include both hard and soft stones, such as:
basalt (blue stone)
granite
limestone
sandstone.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Statutory and regulatory authority includes:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to shape one hard and one soft stone type to design specifications, providing evidence of the ability to:
comply with OHS regulations applicable to workplace operations
apply organisational quality procedures and processes within the context of shaping stone
select and use appropriate processes, tools and equipment to carry out required tasks
adopt and use sound and safe techniques in handling and manoeuvring stone
sound and accurate techniques used to set out stone for shaping processes
display effective and sound procedures to control dust, noise and hazards
demonstrate sound and safe application techniques to use equipment and shape stone.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
hand tools and equipment appropriate to tasks
stone materials applicable to required activities
suitable work area appropriate to application tasks
work drawings and documentation.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm a reasonable inference that competency is not only verified under the particular assessment circumstance, but is able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
N0413 BCF3043A Shape solid stone Unit of competency
Replaced By
State Code National Code Title Type
OCP55 CPCCST3002 Shape solid stone Unit of competency