Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install LPG systems in caravans, mobile homes and mobile workplaces

Install LPG systems in caravans, mobile homes and mobile workplaces

Unit of competency
National Code
CPCPGS3046
State Code
OCN99
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
27/11/2020
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
20
Description
This unit specifies the skills and knowledge required to install and commission liquefied petroleum gas (LPG) systems in caravans, mobile homes and mobile workplaces.It includes identifying LPG system requirements, installing of LPG system including flue and ventilation, and testing and commissioning LPG systems.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Identify LPG system requirements.
  • 1.1 Access, read and determine LPG system installation requirements from relevant job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements.
  • 1.2 Identify and apply workplace policies and procedures, work health and safety (WHS) and environmental requirements.
2 Prepare for work.
  • 2.1 Create a materials list and collect materials.
  • 2.2 Select appropriate tools and equipment including personal protective equipment (PPE).
  • 2.3 Calculate pipe sizing and ventilation requirements.
3 Install, test and commission LPG system, including flue and ventilation.
  • 3.1 Perform installation of cylinders, regulators, associated pipework, appliances and ventilation, complying relevant job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements.
  • 3.2 Select appropriate equipment to conduct testing.
  • 3.3 Perform test and commission system according to relevant job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements.
  • 3.4 Affix compliance plates and signage according relevant job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements.
  • 3.5 Complete documentation according to regulatory requirements and/or workplace procedures.
4 Clean up.
  • 4.1 Clear the work area, and dispose of, reuse or recycle materials in accordance with state and territory legislation and workplace policies and procedures.
  • 4.2 Clean tools and equipment, check for serviceability and report any damage, and store and secure.
No information
No information
Replaces
State Code National Code Title Type
WF892 CPCPGS3046A Install LPG systems in caravans, mobile homes and mobile workplaces Unit of competency