Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Operate and monitor system equipment
Operate and monitor system equipment
Unit of competency
National Code
UEPOPS108
UEPOPS108
State Code
ODX82
ODX82
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
14/04/2023
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/04/2023
Nominal Hours
27
Description
This unit involves the skills and knowledge required to operate, monitor and control high voltage (H.V.) apparatus on the system via supervisory control and data acquisition (SCADA) control.SCADA is acontrol systemthat uses computers, networked data communications andgraphic interfaces.It uses other peripheral devices such asprogrammable logic controllers(PLCs) and discreteproportional integral derivative (PID controllers to interface with plant, equipment or machinery.Competency in this unit requires the ability to plan work, operate system equipment, monitor system equipment, analyse system equipment faults and complete all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator. Power generation plant operators are trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare work
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
- 1.2 Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
- 1.3 System and associated H.V. apparatus and SCADA equipment operational prerequisites are identified and established in accordance with manufacturers' recommendations and specifications, and workplace procedures
- 1.4 Sequence for recommissioning of system and H.V. apparatus and equipment through SCADA is identified and determined in accordance with workplace procedures
2 Operate system and equipment
- 2.1 System and equipment and SCADA programs are operated in accordance with workplace procedures
- 2.2 Load shedding requirements are identified, selected and monitored during equipment operations to ensure system integrity in accordance with workplace procedures
- 2.3 System and operations are completed in consultation with relevant personnel in accordance with workplace procedures
3 Monitor system and equipment
- 3.1 Voltage and current requirements are assessed, evaluated and controlled to maintain system and equipment integrity and stability in accordance with workplace procedures
- 3.2 System and equipment are monitored for normal operations and to detect deviations in accordance with workplace procedures
- 3.3 Corrective actions to rectify system and equipment abnormalities are taken in accordance with workplace procedures
- 3.4 Relevant personnel are notified when system and equipment defects and abnormal operating conditions are detected in accordance with workplace procedures
4 Analyse system and equipment faults
- 4.1 Cause of system equipment operating faults are identified by analysing technical and operational information in accordance with workplace procedures
- 4.2 Operation of protection system is identified and assessed evaluate nature and cause of fault conditions in accordance with workplace procedures
- 4.3 Communication is established with key stakeholders to identify nature and source of equipment system fault and failure in accordance with workplace procedures
- 4.4 System integrity and personnel safety are maintained in consultation with relevant personnel and technical and operational documentation, including contingency plans, in accordance with workplace procedures
5 Complete documentation
- 5.1 Equipment problems, movements and status are reported in accordance with workplace procedures
- 5.2 Documentation is updated in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAG30 | UEPOPS441 | Operate and monitor system equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHQ2 | UEP40122 | Certificate IV in ESI Generation | Qualification |
| BHP9 | UEP50122 | Diploma of ESI Generation | Qualification |