Unit of competency Outline

Date retreived
23/07/2026 6:50 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install sprung timber flooring

Install sprung timber flooring

Unit of competency
National Code
MSFFL3118
State Code
OEY54
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
21/12/2022
State Implementation and Classification
Approved Date
19/04/2023
Field of Education
040321 - Floor Coverings
Original Release Date
19/04/2023
Nominal Hours
35
Description
This unit describes the skills and knowledge required to set out, cut and lay timber for the installation of a special-purpose sprung platform-based timber floor (such as in a sports or leisure facility).Workers with this competency undertake routine tasks according to job instructions and workplace procedures using discretion, judgement and problem-solving to identify and resolve routine issues. They work with a high degree of self-direction under routine supervision, and they are responsible for their output.The work described in this unit may require a licence or certification in some jurisdictions, and state or territory authorities should be consulted to determine the current status. Workers on construction sites are required by law to complete induction training.They must also comply with relevant legislation, regulations, Australian Standards, codes and manufacturer installation instructions.
Notes
Elements and Performance Criteria
1. Prepare to install sprung timber flooring
  • 1.1 Interpret sprung timber flooring installation requirements from job and manufacturer instructions and calculate the quantities of materials required
  • 1.2 Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating
  • 1.3 Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures
  • 1.4 Gather the flooring material and confirm its species, grade, size, quantity and quality against job instructions
  • 1.5 Check and confirm the flooring material’s moisture content is suitable for site conditions according to workplace procedures
  • 1.6 Gather the underlay, adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
  • 1.7 Confirm the subfloor is clean and suitable for installing the flooring, and fix or report any deficiencies according to workplace procedures
  • 1.8 Remove or undercut door jambs, cover trims and other joinery, and store for refitting or send for machining according to job instructions
2. Cut, fit and fasten sprung timber flooring
  • 2.1 Install underfloor pads according to manufacturer instructions
  • 2.2. Install batten and/or sheet substrate materials according to job and manufacturer instructions
  • 2.3 Establish the starting point and mark out working lines
  • 2.4 Lay out the flooring according to job instructions to maximise aesthetics with respect to material colours, grains and patterns, to minimise waste and joins, and to ensure an efficient, quality installation
  • 2.5 Measure, mark and cut the flooring to length and size
  • 2.6 Install the flooring according to the manufacturer instructions, allowing appropriate field and perimeter expansion joints
  • 2.7 Refit removed items and finish installing the flooring
  • 2.8 Check the flooring is installed correctly according to job instructions and quality requirements, and fix any deficiencies
  • 2.9 Make any necessary preparations for sanding the flooring, according to job instructions
3. Complete the task according to workplace procedures
  • 3.1 Clean up the work area, identify items for recycling and dispose of waste
  • 3.2 Identify, tag and report any damage to equipment and tools
  • 3.3 Check, clean and do routine maintenance on equipment and tools and store them and unused materials
  • 3.4 Complete task outcome documentation
No information
No information
No information
State Code National Code Title Type
BIY1 MSF30822 Certificate III in Flooring Technology Qualification