Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Undertake proactive maintenance analyses

Undertake proactive maintenance analyses

Unit of competency
National Code
MSACMT481A
State Code
W9010
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/12/2005
State Implementation and Classification
Approved Date
30/06/2011
Field of Education
080317 - Quality Management
Original Release Date
30/06/2011
Nominal Hours
50
Description
This unit covers the skills needed for the most common forms of analyses associated with predictive maintenance strategies.
Notes
Elements and Performance Criteria
1. Liaise with operator
  • 1.1. Establish a relationship with the operator/s of equipment/plant1.2. Ensure the operator has the required skills and resources to keep the equipment/plant clean1.3. Ensure the operator is able to effectively monitor the operation of the equipment/plant1.4. Regularly communicate with operator about the Overall Equipment Efficiency (OEE) of their equipment/plant 1.5. Involve operator, team leader and other key personnel in identification of skill needs and means of skill acquisition to fill any identified gaps
2. Analyse history
  • 2.1. Analyse Mean Time Between Failures ( MTBF) (or similar statistical history analysis)from maintenance records 2.2. Analyse performance data of the equipment/plant2.3. Identify causes of changes to historic trends/status2.4. Determine methods of ensuring causes of improvements are locked in and deterioration resolved
3. Undertake Failure Mode Effects Analysis (FMEA) (or similar)
  • 3.1. Undertake analysis3.2. Record results of analysis3.3. Investigate methods of eliminating possibility of failure and/or minimising the impact of the failure3.4. Liaise with operator, team leader and other key personnel regarding possible solutions3.5. Select most appropriate solution3.6. Implement selected solutions
4. Undertake condition monitoring analysis
  • 4.1. Obtain data for condition monitoring analysis4.2. Interpret condition monitoring data4.3. Predict required maintenance type and timing from condition monitoring data4.4. Liaise with operator, team leader and other key personnel regarding implications of condition monitoring report4.5. Involve team members in development of changes to maintenance strategy to ensure awareness, learning and commitment

Competitive manufacturing is used to describe the range of systemic manufacturing practice concepts and approaches. It covers but is not limited to:

lean manufacturing

agile manufacturing

preventative and predictive maintenance approaches

monitoring and data gathering systems such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Manufacturing Resource Planning (MRP), and proprietary systems such as SAP etc.

statistical process control systems including six sigma and three sigma

Just in Time (JIT), kanban and other pull related manufacturing control systems

supply, value, and demand chain monitoring and analysis

other continuous improvement systems.

Competitive manufacturing should be interpreted so as to take into account the stage of implementation of competitive manufacturing approaches, the enterprise's size and work organisation, culture, regulatory environment and manufacturing sector.


Overall Equipment Efficiency (OEE) is the combination of the main factors causing loss of productive capacity from equipment/plant and is:

where:

availability takes into account losses due to breakdown, set up and adjustments

performance takes into account losses due to minor stoppages, reduced speed and idling

quality rate takes into account t losses due to rejects, reworks and start up waste.


Mean Time Between Failure (MTBF) is one key measure of the effectiveness of a maintenance procedure, and is an indicator as to whether root causes are being found and resolved. If MTBF is reducing, then it is an indicator that the maintenance regime is failing.

There are many possible causes of any problem. Eliminating some will have no impact, others will ameliorate the problem. However, elimination of the root cause will eliminate the problem. There should only be one root cause for any problem and so the analysis should continue until this one cause is found. Elimination of the root cause permanently eliminates the problem.


Failure Mode and Effects Analysis (FMEA) is a systematic approach that identifies potential failure modes in a system, product, or manufacturing/assembly operation caused by either design or manufacturing/assembly process deficiencies. It also identifies critical or significant design or process characteristics that require special controls to prevent or detect failure modes. FMEA is a tool used to prevent problems from occurring.

Some industry sectors have highly adapted forms of FMEA and may practice traditional FMEA in say their routine maintenance while using another technique (such as


In this unit condition monitoring is used to describe the process of analysing the implications of condition monitoring data for proactive maintenance whether it be obtained from non destructive testing reports, visual assessment by experts, diagnostic reports obtained from SCADA or other enterprise or equipment software and product or process quality analyses. It does not require the actual undertaking of the NDT or condition monitoring assessment or test. If this is required appropriate units from other Training Packages will be required.

Overview of assessment requirements
The person will be able to undertake a range of predictive maintenance analyses as well as support operations staff, and implement an advanced maintenance strategy.

What critical aspects of evidence are required to demonstrate competency in this unit?
Evidence should be available as to the analyses undertaken and the support provided.

In what context should assessment occur?
Assessment needs to occur in an organisation using predictive maintenance strategies or a simulation in a workshop or by case study.

Are there any other units which could or should be assessed with this unit or which relate directly to this unit?
This unit may be assessed concurrently with other relevant maintenance units.
This unit is related to:

What method of assessment should apply?
Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the elements, performance criteria, skills and knowledge. A holistic approach should be taken to the assessment.
Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit.
The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace.
The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment.

What evidence is required for demonstration of consistent performance?
Generally evidence will be required from a range of predictive maintenance analyses in order to have sufficient evidence.

What are the specific resource requirements for this unit?
Access to an organisation using predictive maintenance procedures.

Replaces
State Code National Code Title Type
W2592 MCMT481A Undertake proactive maintenance analyses Unit of competency
Replaced By
State Code National Code Title Type
WD542 MSS404081A Undertake proactive maintenance analyses Unit of competency