Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Lay up and tape cables

Lay up and tape cables

Unit of competency
National Code
PMBPROD303
State Code
BAI80
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
1.00
Current Release Date
22/06/2016
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
030305 - Materials Engineering
Original Release Date
05/08/2016
Nominal Hours
26
Description
This unit of competency covers the skills and knowledge required to operate and adjust cable lay-up, taping and armouring equipment and ancillary equipment that is integral to the process. It applies to processing of armoured cable, screened cable or similar wires and cables.This unit of competency applies to advanced operators who are required to start up and shut down cable lay-up, taping and armouring equipment, monitor equipment operation and make adjustments to remedy faults and non-conformity, maintain continuity of process and solve problems within area of responsibility.This unit of competency applies to an advanced operator demonstrating theoretical and technical knowledge and well developed skills in situations that require some discretion and judgement. The advanced operator may work alone or as a member of a team or group and will work in liaison with other shift team members, team leader and supervisor, as appropriate.This unit of competency may be contextualised and applied to similar processes using rotating plant and equipment which are not covered by specific units of competency. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan own work requirements
  • 1.1 Identify equipment and processes used for production process and upstream and downstream operations from production plan or request
  • 1.2 Identify materials required including additives
  • 1.3 Recognise hazards and take appropriate action
  • 1.4 Identify and check emergency stops, guards and controls
  • 1.5 Identify requirements for materials, quality, production and equipment checks
  • 1.6 Identify materials, waste management and housekeeping needs
2 Check equipment set-up
  • 2.1 Determine equipment requirements
  • 2.2 Set process to specifications as required
  • 2.3 Check materials are correct
  • 2.4 Check tensions, tape lay-up or tensions of armouring materials to requirements
  • 2.5 Check rotating plant and equipment settings and adjustments, including tensions, lay length, attachments to spools and threading path adjustments, to specifications
  • 2.6 Attach wire to spools and fit appropriate taping materials
  • 2.7 Discard, or make adjustments to the process for, non-conforming materials
  • 2.8 Set up date, batch and materials markings to specifications, as required
  • 2.9 Complete other pre-start checks to procedures
3 Operate lay-up and taping equipment to procedures
  • 3.1 Check and load materials using correct manual handling methods
  • 3.2 Start up equipment and make adjustments to reach required settings
  • 3.3 Monitor controls/displays/terminals for production/process data
  • 3.4 Monitor product/process quality as required
  • 3.5 Maintain continuity of process
  • 3.6 Make adjustments to remedy faults and non-conformity to standard as required
  • 3.7 Collect and reprocess/discard scrap/trim and other materials as required
  • 3.8 Complete required workplace documentation/records.
  • 3.9 Clean, adjust and lubricate equipment as required
  • 3.10 Pause or stop equipment in an emergency, as required
4 Shut down equipment to procedures
  • 4.1 Shut down equipment as required
  • 4.2 Complete equipment cleanup, adjustments and waste management
  • 4.3 Place suitable guards, locks and notices to prevent inadvertent start-up
5 Anticipate and solve problems
  • 5.1 Recognise a problem or a potential problem
  • 5.2 Determine problems needing priority action
  • 5.3 Refer problems outside area of responsibility to appropriate person, with possible causes
  • 5.4 Seek information and assistance as required to solve problems
  • 5.5 Solve problems within area of responsibility
  • 5.6 Follow through items initiated until final resolution has occurred
No information
No information
Replaces
State Code National Code Title Type
W7616 PMBPROD303C Lay up and tape cables Unit of competency
Replaced By
State Code National Code Title Type
ODB11 PMBPROD303E Produce cable and tape lay-up cables Unit of competency
State Code National Code Title Type
BCT3 PMB30116 Certificate III in Polymer Processing Qualification
BCU0 PMB40116 Certificate IV in Polymer Technology Qualification