Unit of competency Outline

Date retreived
23/07/2026 11:17 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Design complex cold water systems

Design complex cold water systems

Unit of competency
National Code
CPCPCM5011
State Code
OCO60
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
23/12/2020
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
60
Description
This unit specifies the skills and knowledge required to design complex cold water distribution systems in commercial and high-rise mixed development building to a minimum of 29 floors inclusive of a basement. The unit requires application of technical skills and knowledge to design and size systems and prepare operational and compliance documentation. The role may involve interaction with architects, builders, suppliers, clients and relevant planning authorities and requires a sound understanding of applicable legislation, standards and codes.This unit requirements are typically carried out by a consultant or design engineer. Application of the unit is relevant to multi-storey residential, commercial and industrial buildings with or without connection to reticulated water supply.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Evaluate design parameters.
  • 1.1 Identify and establish scope of work from preliminary information and in consultation with associated persons.
  • 1.2 Determine design parameters from relevant Australian Standards, codes, plans, specifications, statutory and regulatory requirements and client brief.
  • 1.3 Apply sustainability principles and concepts as part of the design process.
  • 1.4 Establish performance requirements, considering safety of system users or building occupants.
  • 1.5 Determine available pressure and flow rates at site location.
  • 1.6 Conduct research, including a desktop study to outline design parameters.
  • 1.7 Interpret manufacturer requirements and trade and technical manuals.
  • 1.8 Conduct a cost-benefit analysis to compare a range of materials and system designs.
2 Plan and detail system components.
  • 2.1 Plan layout of pipework systems, including the type and location of fittings and valves and acoustic performance of the system.
  • 2.2 Detail type, location and requirements for backflow prevention devices.
  • 2.3 Specify flush valve system types and operation.
  • 2.4 Calculate pipe sizes, velocities, flows and residual pressures for a range of applications.
  • 2.5 Detail or design cold water system components.
  • 2.6 Size and detail pump, pump controls and pump room requirements.
  • 2.7 Specify approved materials, jointing methods and installation requirements.
3 Design and size systems.
  • 3.1 Design systems for a range of wide-span and high-rise building applications.
  • 3.2 Design flush valve distribution systems for sanitary ablutions.
  • 3.3 Design a range of delivery systems.
  • 3.4 Design and size complex cold water distribution systems using computer software packages.
  • 3.5 Design water storage and break tanks.
  • 3.6 Design cold water pressure systems and incorporate into building supply system.
  • 3.7 Design backflow penetration systems associated with cold water systems.
  • 3.8 Calculate pipe sizes, velocities and pressures.
  • 3.9 Calculate system pressures, pressure losses and pressure reduction measures.
4 Prepare documentation.
  • 4.1 Prepare client brief for the preferred design.
  • 4.2 Prepare plans and specifications for designing complex cold water systems.
  • 4.3 Prepare testing and commissioning schedule.
  • 4.4 Produce operation and maintenance manual for maintaining cold water systems.
No information
No information
Replaces
State Code National Code Title Type
WF852 CPCPCM5011A Design complex cold water systems Unit of competency
State Code National Code Title Type
BGB3 CPC50620 Diploma of Hydraulic Services Design Qualification