Unit of competency Outline
Date retreived
24/07/2026 1:58 AM AWST
24/07/2026 1:58 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct erosion and sediment control activities
Conduct erosion and sediment control activities
Unit of competency
National Code
AHCSAW201A
AHCSAW201A
State Code
D7234
D7234
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/08/2014
Field of Education
050999 - Environmental Studies, N.e.c.
Original Release Date
04/08/2014
Nominal Hours
40
Description
This unit covers the process of carrying out erosion and sediment control activities in both urban and rural environments and defines the standard required to: assess risks from erosion and sediment at a site; assemble structures to prevent erosion and control sediment at a site; carry out sediment control activities in accordance with legislation and stakeholder requirements; confirm that erosion and sediment control meets enterprise requirements.
Notes
Elements and Performance Criteria
1. Align work site practices with erosion and sediment control principles
- 1.1. Erosion and sedimentation legislation is adhered to at the work site as a part of contract works.
- 1.2. Procedures relating to erosion and sediment control are applied on the work site to align with industry standards.
2. Implement erosion and sediment control principles in the workplace
- 2.1. Breaches of erosion and sediment control legislation are noted and reported.
- 2.2. Industry practices for erosion and sediment control are applied in the work place.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole.
Control activities may include:
grade stabilising structures
outlet protection structures
storm water detention measures
dust control
revegetation for the purpose of controlling erosion.
The range statement relates to the unit of competency as a whole.
Control activities may include:
grade stabilising structures
outlet protection structures
storm water detention measures
dust control
revegetation for the purpose of controlling erosion.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
assess risks from erosion and sediment at a site
assemble structures to prevent erosion and control sediment at a site
carry out sediment control activities in accordance with legislation and stakeholder requirements
confirm that erosion and sediment control meets enterprise requirements.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
assess risks from erosion and sediment at a site
assemble structures to prevent erosion and control sediment at a site
carry out sediment control activities in accordance with legislation and stakeholder requirements
confirm that erosion and sediment control meets enterprise requirements.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S2597 | RTD2202A | Conduct erosion and sediment control activities | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAO79 | AHCSAW201 | Conduct erosion and sediment control activities | Unit of competency |