Unit of competency Outline

Date retreived
22/07/2026 10:43 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Establish quarry development

Establish quarry development

Unit of competency
National Code
RIIRAI608A
State Code
WB414
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
22/06/2011
State Implementation and Classification
Approved Date
20/01/2010
Field of Education
030303 - Mining Engineering
Original Release Date
20/01/2010
Nominal Hours
60
Description
This unit covers establishing quarry development in the extractive industries. It includes: determining the site development parameters; identifying and securing the development site; preparing the site development plan; and obtaining the site development consent.
Notes
Elements and Performance Criteria
1. Determine site development parameters
  • 1.1. Identify, interpret and clarify relevant compliance documentation and use them in the development and document site development parameters
  • 1.2. Identify, interpret and clarify relevant marketing information and use it to development and document site development parameters
2. Identify and secure development site
  • 2.1. Identify sites with the potential of meeting the required parameters for the quarry development
  • 2.2. Identify and interpret the titles and zoning on potential development sites
  • 2.3. Obtain permission required for the investigation of potential quarry development sites
  • 2.4. Organise and manage the investigation of potential development sites
  • 2.5. Determine the most suitable quarry site based on the outcomes of the investigations and the development parameters and cost of acquisition, development and operation of the site
  • 2.6. Obtain required organisational approvals and secure the development site
3. Prepare site development plan
  • 3.1. Involve internal and external stakeholders in the planning process in a way that uses their contribution effectively and gains their support for the outcomes
  • 3.2. Identify and document the options for the end use of the site
  • 3.3. Organise and manage community consultation on the proposed site development
  • 3.4. Organise and manage the design and documentation of the preliminary plan of the pit development based on the geological, hydrological and survey data and relevant legislative and organisation requirements and procedures
  • 3.5. Organise and manage the design and documentation of the preliminary plan of the processing plant to meet the site development parameters and based on the geological, hydrological and survey data and relevant legislative and organisation requirements and procedures
  • 3.6. Organise and manage the design and documentation of the preliminary site access and infrastructure to meet the site development parameters and based on the geological and survey data and relevant legislative and organisation requirements and procedures
  • 3.7. Organise and manage the assessment and documentation of the environmental impact of the proposed site development
  • 3.8. Determine and document resource implications of the site development plan
4. Obtain site development consent
  • 4.1. Organise and manage the preparation of the development application and the required accompanying documentation
  • 4.2. Identify and provide support required for the site development application
  • 4.3. Communicate the progress and outcomes of the development application to relevant stakeholders
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation
may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Site development parameters may include:
risk management requirements
occupational health and safety requirements
environmental
minimum operating distances from other operations or neighbouring structures or land use
required production volumes
product requirements
quality requirements
market locations and volumes
existing processing plant capacity
catering for the rock, sand or gravel characteristics
raw feed requirements to meet product needs
annual extraction or sales limitations
potential environmental works
potential processing plant location
raw feed haulage requirements
land clearance requirements
stripping and stockpiling of soil requirements
progressive and final rehabilitation requirements
final landform and use requirements
bench heights limitations
water management requirements
general development consent requirements
general operating hours limitations
Marketing information may include:
product specifications
sales volumes
market locations
Permission required may include:
entering into option agreements
payment of access fees
entering into rehabilitation agreements
Investigation of potential development sites may include:
search of geological survey data
title search
zoning search
field geological investigation
drilling programs
trial blasts
trail excavation
testing of raw feed samples
collection and analysis of hydrological data
community consultation
consultation with regulatory authorities
Internal and external stakeholders may include:
senior management
operating managers
project managers
other employees
regulatory authority representatives
tenderers
contractors
community
suppliers
customers
Geological data may include:
limits of the deposit
rock (or other resource) types and characteristics
faults and joints
water tables or other water sources
Hydrological data may include:
rainfall
surface water
catchment areas
run-off characteristics
groundwater
existing streams, bores and dams
Survey data may include:
site and neighbouring land form
site and neighbouring boundaries and structures
site and neighbouring roads and other infrastructure
approved limits of extraction
title details
Resource implications may include:
human
fixed and mobile plan
equipment
technology
buildings
infrastructure
power/energy
financial

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the establishing of a quarry development
implementation of procedures and techniques for the safe, effective and efficient completion of the establishing of a quarry development
the identification of the relevant information and scope of the work required to meet the required outcomes
the identification of viable program options and the selection of programs that best meet the required outcomes
working with others to undertake and complete the establishing of a quarry development
consistent and timely completion of the establishing of a quarry development
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in a civil works environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate procedures and techniques for the safe, effective and efficient achievement of the required outcomes
identification of the relevant information and scope of the work required
identification of viable options and the selection of options that best meet the required outcomes
consistently achieving the required outcomes
first hand testimonial and documentary evidence of the candidate's:
working with others to establish a quarry development
consistent and timely gaining of approval of a quarry development
provision of clear, timely required support and advice on the implementation of the quarry development
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Replaces
State Code National Code Title Type
W1670 MNQOPS600A Establish quarry development Unit of competency
Replaced By
State Code National Code Title Type
WH639 RIIRAI608D Establish quarry development Unit of competency
State Code National Code Title Type
W707 RII60209 Advanced Diploma of Extractive Industries Management Qualification