Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Lay up timber roof trusses
Lay up timber roof trusses
Unit of competency
National Code
FPICOT3242A
FPICOT3242A
State Code
S4630
S4630
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
25/05/2011
Field of Education
030111 - Wood MacHining And Turning
Original Release Date
25/05/2011
Nominal Hours
40
Description
Notes
Elements and Performance Criteria
No information
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below
OHS requirements are to be in accordance with Commonwealth, State or Territory legislation and regulations, and organisational safety policies and procedures. Requirements may include:
the use of personal protective equipment and clothing
safety equipment
first aid equipment
fire fighting equipment
hazard and risk control
elimination of hazardous materials and substances
manual handling including shifting, lifting and carrying
Legislative requirements are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include:
award and enterprise agreements
industrial relations
Australian Standards
confidentiality and privacy
OHS
the environment
equal opportunity
anti-discrimination
relevant industry codes of practice
duty of care
Organisational requirements
may include legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)
Timber roof trusses
are frames or jointed structures designed to act as a beam of long span, while each member is usually subjected to longitudinal stress only, either tension or compression. Trusses may include joists, rafters, purlins, chords and beams
Work order
is to include instructions for the assembly and despatch of timber and timber products from the work site and may include construction plans or drawings, type of product, size, quantity and grade
Appropriate personnel
may include supervisors, suppliers, clients, colleagues and managers
Material
may include native timber species, imported timber species, dressed timber, in-the-rough timber, stress and non-stress graded timber, preservative treated timber, laminated veneer, coated and/or treated timber products, beams or laminated beams
Assembly hardware
may include nailing plates, gang nails, nail gun nails and staples
Equipment
may include measuring equipment, circular saws, docking saws, drills, assembly jigs, nail plate presses, staple guns, nail guns, compressor or compressed air supply, marking equipment and strapping equipment
Set up jigs
may include enterprise manufactured templates which assist in the positioning of components during the assembly process
Communication
may include verbal and non-verbal language, constructive feedback, active listening, questioning to clarify and confirm understanding, use of positive, confident and cooperative language, use of language and concepts appropriate to individual social and cultural differences, control of tone of voice and body language
Timber components
are the sections of timber or timber product which have been pre-cut in readiness for assembly and have been cut to comply with the construction plans and cutting list
Defective components
may include components with an unacceptable level of warp, wane, cupping, shakes, insect defects, knots or resin pockets
Assembly faults
may include incorrectly positioned joints, timber splits from nailing and incorrectly positioned hardware
Stacking
may include preparation for transport, categorising in common size, shape, lots marked in accordance with work order and site requirements and located as not to block access or passage
Strapping
may include securing bundles with metal or plastic strap, tightening and tensioning using hand held equipment, to prevent slippage without risk of strap breakage or damage to products
Equipment faults
may include damaged equipment components or electrical faults
Records and reports
may include product type, size, inspection, grading and labelling outcomes, storage locations, quality outcomes, hazards, incidents or equipment malfunctions
may be manual, using a computer-based system or another appropriate organisational communication system
OHS requirements are to be in accordance with Commonwealth, State or Territory legislation and regulations, and organisational safety policies and procedures. Requirements may include:
the use of personal protective equipment and clothing
safety equipment
first aid equipment
fire fighting equipment
hazard and risk control
elimination of hazardous materials and substances
manual handling including shifting, lifting and carrying
Legislative requirements are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include:
award and enterprise agreements
industrial relations
Australian Standards
confidentiality and privacy
OHS
the environment
equal opportunity
anti-discrimination
relevant industry codes of practice
duty of care
Organisational requirements
may include legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)
Timber roof trusses
are frames or jointed structures designed to act as a beam of long span, while each member is usually subjected to longitudinal stress only, either tension or compression. Trusses may include joists, rafters, purlins, chords and beams
Work order
is to include instructions for the assembly and despatch of timber and timber products from the work site and may include construction plans or drawings, type of product, size, quantity and grade
Appropriate personnel
may include supervisors, suppliers, clients, colleagues and managers
Material
may include native timber species, imported timber species, dressed timber, in-the-rough timber, stress and non-stress graded timber, preservative treated timber, laminated veneer, coated and/or treated timber products, beams or laminated beams
Assembly hardware
may include nailing plates, gang nails, nail gun nails and staples
Equipment
may include measuring equipment, circular saws, docking saws, drills, assembly jigs, nail plate presses, staple guns, nail guns, compressor or compressed air supply, marking equipment and strapping equipment
Set up jigs
may include enterprise manufactured templates which assist in the positioning of components during the assembly process
Communication
may include verbal and non-verbal language, constructive feedback, active listening, questioning to clarify and confirm understanding, use of positive, confident and cooperative language, use of language and concepts appropriate to individual social and cultural differences, control of tone of voice and body language
Timber components
are the sections of timber or timber product which have been pre-cut in readiness for assembly and have been cut to comply with the construction plans and cutting list
Defective components
may include components with an unacceptable level of warp, wane, cupping, shakes, insect defects, knots or resin pockets
Assembly faults
may include incorrectly positioned joints, timber splits from nailing and incorrectly positioned hardware
Stacking
may include preparation for transport, categorising in common size, shape, lots marked in accordance with work order and site requirements and located as not to block access or passage
Strapping
may include securing bundles with metal or plastic strap, tightening and tensioning using hand held equipment, to prevent slippage without risk of strap breakage or damage to products
Equipment faults
may include damaged equipment components or electrical faults
Records and reports
may include product type, size, inspection, grading and labelling outcomes, storage locations, quality outcomes, hazards, incidents or equipment malfunctions
may be manual, using a computer-based system or another appropriate organisational communication system
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for this Training Package
Overview of assessment
A person who demonstrates competency in this unit must be able to provide evidence that they can safely and efficiently lay up timber roof trusses within organisational requirements
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Comply with applicable Commonwealth, State or Territory legislative and regulatory requirements and codes of practice, including OHS, environmental and organisational policies and procedures, relevant to laying up timber roof trusses
Communicate effectively and work safely with others in the work area
Effectively lay up timber roof trusses in accordance with the work order and construction plans to comply with construction standards and engineering specifications
Efficiently stack and strap bundles of completed products in accordance with organisational requirements and OHS regulations
Context of and specific resources for assessment
Competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to comply with relevant regulatory or Australian Standards requirements
The following resources should be made available:
workplace location or simulated workplace
materials and equipment relevant to laying up timber roof trusses
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the FPI05 Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment must be by direct observation of tasks, with questioning on underpinning knowledge and it must also reinforce the integration of key competencies
Assessment methods must confirm the ability to access and correctly interpret and apply the essential underpinning knowledge
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The assessment environment should not disadvantage the candidate
Assessment practices should take into account any relevant language or cultural issues related to Aboriginality, gender or language backgrounds other than English
Where the participant has a disability, reasonable adjustment may be applied during assessment
Language and literacy demands of the assessment task should not be higher than those of the work role
The seven key competencies represent generic skills considered necessary for effective participation by an individual in the workplacePerformance Level 1 at this level, the candidate is required to undertake tasks effectivelyPerformance Level 2 at this level, the candidate is required to manage tasksPerformance Level 3 at this level, the candidate is required to use concepts for evaluating and reshaping tasks
Communicating ideas and information
By communicating in simple language to confirm work requirements, convey information and requests to colleagues, and report and record outcomes (2)
Collecting analysing and organising information
By collecting, organising and understanding specifications for laying up of timber roof trusses (2)
Planning and organising activities
By organising work activities in the correct sequence for laying up of timber roof trusses to be completed within the designated timeframes (2)
Working with others and in teams
By using effective communication and interpersonal techniques with colleagues and others to maximise confidence, satisfaction and productivity (2)
Using mathematical ideas and techniques
By calculating time to complete tasks and estimating tools, equipment and material requirements including measuring material lengths and degree of angles (2)
Solving problems
By establishing safe and effective laying up processes which anticipate likely problems to avoid wastage and downtime (2)
Using technology
By selecting and using hardware installation equipment and jigs to lay up timber roof trusses (2)
Overview of assessment
A person who demonstrates competency in this unit must be able to provide evidence that they can safely and efficiently lay up timber roof trusses within organisational requirements
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Comply with applicable Commonwealth, State or Territory legislative and regulatory requirements and codes of practice, including OHS, environmental and organisational policies and procedures, relevant to laying up timber roof trusses
Communicate effectively and work safely with others in the work area
Effectively lay up timber roof trusses in accordance with the work order and construction plans to comply with construction standards and engineering specifications
Efficiently stack and strap bundles of completed products in accordance with organisational requirements and OHS regulations
Context of and specific resources for assessment
Competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to comply with relevant regulatory or Australian Standards requirements
The following resources should be made available:
workplace location or simulated workplace
materials and equipment relevant to laying up timber roof trusses
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the FPI05 Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment must be by direct observation of tasks, with questioning on underpinning knowledge and it must also reinforce the integration of key competencies
Assessment methods must confirm the ability to access and correctly interpret and apply the essential underpinning knowledge
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The assessment environment should not disadvantage the candidate
Assessment practices should take into account any relevant language or cultural issues related to Aboriginality, gender or language backgrounds other than English
Where the participant has a disability, reasonable adjustment may be applied during assessment
Language and literacy demands of the assessment task should not be higher than those of the work role
The seven key competencies represent generic skills considered necessary for effective participation by an individual in the workplacePerformance Level 1 at this level, the candidate is required to undertake tasks effectivelyPerformance Level 2 at this level, the candidate is required to manage tasksPerformance Level 3 at this level, the candidate is required to use concepts for evaluating and reshaping tasks
Communicating ideas and information
By communicating in simple language to confirm work requirements, convey information and requests to colleagues, and report and record outcomes (2)
Collecting analysing and organising information
By collecting, organising and understanding specifications for laying up of timber roof trusses (2)
Planning and organising activities
By organising work activities in the correct sequence for laying up of timber roof trusses to be completed within the designated timeframes (2)
Working with others and in teams
By using effective communication and interpersonal techniques with colleagues and others to maximise confidence, satisfaction and productivity (2)
Using mathematical ideas and techniques
By calculating time to complete tasks and estimating tools, equipment and material requirements including measuring material lengths and degree of angles (2)
Solving problems
By establishing safe and effective laying up processes which anticipate likely problems to avoid wastage and downtime (2)
Using technology
By selecting and using hardware installation equipment and jigs to lay up timber roof trusses (2)