Unit of competency Outline
Date retreived
22/07/2026 11:05 PM AWST
22/07/2026 11:05 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install high current d.c. equipment and switchgear
Install high current d.c. equipment and switchgear
Unit of competency
National Code
UETTDRSB26
UETTDRSB26
State Code
OBH04
OBH04
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
04/12/2019
Nominal Hours
36
Description
This unit involves the skills and knowledge required to install high current equipment and switchgear in the electricity supply industry (ESI).It includes installing direct current (d.c.) switchgear and other equipment, such as rectifier transformers, rectifiers, invertors, isolators and links, harmonic filters, negative reactors and energy dissipation resistors EDR’s to ensure correct installation to workplace procedures and industry standards.It also includes isolating systems and/or circuits for safe working in accordance with work plans, visual inspections and necessary checks to ensure equipment and components have been correctly installed in accordance with design and are in a safe condition for pre-commissioning tests prior to energisation, as well as updating installation data and relevant quality assurance documentation.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan to install high current d.c. switchgear and equipment
- 1.1 Work schedules, construction plans, drawings, workplace procedures and material lists are obtained and analysed
- 1.2 Job requirements and workplace procedures are identified and communicated with relevant personnel
- 1.3 Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS)risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
- 1.4 Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
- 1.5 Risk control measures are identified, prioritised, implemented and evaluated against the work schedule
- 1.6 Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- 1.7 Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to facilitate work, as required
- 1.8 Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures
- 1.9 Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
2 Carry out installation of high currentd.c. switchgear and equipment
- 2.1 WHS/OHS, sustainable energy and environmental principles and practices are monitored and actioned to reduce incidents of accidents in accordance with workplace procedures
- 2.2 Cardiopulmonary resuscitation (CPR), rescue from live electrical apparatus and other related safety procedures are in place in accordance with job requirements and/or workplace procedures
- 2.3 Safe working documentation is acquired and requirements completed in accordance with workplace procedures
- 2.4 Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures
- 2.5 Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to the immediate authorised persons for directions in accordance with workplace procedures
- 2.6 High current d.c. switchgear and equipment are installed in accordance with work schedules, job requirements and workplace procedures
- 2.7 High current d.c. switchgear and equipment are safely installed to ensure completion in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
- 2.8 Unplanned events or conditions are responded to in accordance with workplace procedures
3 Complete installation of high currentd.c. switchgear and equipment
- 3.1 Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
- 3.2 Safe working documentation is surrendered and equipment made ready for service
- 3.3 Worksite is rehabilitated, cleaned up and confirmed safe in accordance with workplace procedures
- 3.4 Tools, equipment, surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures
- 3.5 Work records, reports and/or documentation are completed in accordance with workplace procedures and relevant personnel notified
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD736 | UETTDRSB26A | Install high current DC equipment and switchgear | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OED74 | UETDRSB008 | Install high current d.c. equipment and switchgear | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHB2 | UET40521 | Certificate IV in ESI - Power Systems Substations | Qualification |
| BEV5 | UET40519 | Certificate IV in ESI - Power Systems Substations | Qualification |