Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Prepare detailed traffic analysis
Prepare detailed traffic analysis
Unit of competency
National Code
RIICWD526A
RIICWD526A
State Code
WB093
WB093
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/07/2012
Field of Education
030909 - Transport Engineering
Original Release Date
19/07/2012
Nominal Hours
60
Description
This unit covers the completion of the detailed traffic analysis and documentation of that analysis in Civil Construction. It includes the preparation and planning for the detailed analysis, undertaking of the detailed analysis, finalisation of the detailed analysis processes and supporting the application of the detailed analysis.
Notes
Elements and Performance Criteria
1. Completion and documentation of the detailed traffic analysis
- 1.1. Access, interpret and apply compliance documentation relevant to the work activity
- 1.2. Identify and confirm the traffic analysis project requirements and information for the completion of the detailed analysis
- 1.3. Prepare an analysis plan which makes best use of the available resources and meets the analysis requirements
2. Undertake the detailed traffic analysis
- 2.1. Interpret and analyse the relevant data and identify the available viable options for the detailed traffic analysis
- 2.2. Interpret and analyse relevant data and recommend the preferred option that best meets the required project outcomes
- 2.3. Complete the detailed traffic analysis that safely, effectively and efficiently meets the required project outcomes
- 2.4. Participate in the review of the traffic analysis with peers and stakeholders
- 2.5. Complete the documentation of the traffic analysis
- 2.6. Monitor and coordinate the progress of other team members involved in the analysis process
- 2.7. Gain analysis approval
3. Finalise detailed traffic analysis processes
- 3.1. Ensure filing of analysis records is completed
- 3.2. Complete and submit analysis cost and other reporting
- 3.3. Participate in performance review of the analysis process
- 3.4. Seek client feedback and contribute to the verification of the analysis
- 3.5. Close out all systems
4. Support and review the application of the traffic analysis
- 4.1. Provide clarification and advice to those applying the analysis
- 4.2. Review the application of the analysis and recommend changes for the continuous improvements of traffic detailed analysis
- 4.3. Contribute to the validation of the analysis
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation
may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Confirm
may include:
consultation with the client
consultation with others within the organisation
consultation with relevant authorities
conducting a risk assessment of the existing and potential hazards that may affect the data collection process
obtaining further site data, including:
known and potential hazards, constraints and conditions
cultural and heritage data
geological data
geotechnical data
hydrological data
survey data
meteorological data
Traffic analysis
may include its application for:
roads
car parks
industrial hardstands
Project requirements and information
may include:
project specifications
contractual requirements
client's requirements
project site geological data
project site hydrological data
project site engineering survey data
project site cultural and heritage constraints
existing project design and drawings
Australian or other relevant standards
Analysis plan
may include:
human resource requirements
design hardware and software
coordination requirements
scheduling
review requirements
design process communication and reporting requirements
Preferred option factors
may include:
cost
site constraints
available resources
risk assessment of:
the existing conditions
the application of the analysis
maintainability of the completed works
Detailed traffic analysis
may include:
calculations, including:
level of service
capacity
drawings(or sketches)
risk assessment of:
the existing conditions
the conduct of the analysis
health, safety and environmental requirements
contribution to ancillary documentation, which may include:
analysis notes
supplementary drawings
outcomes and recommendations
Relevant compliance documentation
may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Confirm
may include:
consultation with the client
consultation with others within the organisation
consultation with relevant authorities
conducting a risk assessment of the existing and potential hazards that may affect the data collection process
obtaining further site data, including:
known and potential hazards, constraints and conditions
cultural and heritage data
geological data
geotechnical data
hydrological data
survey data
meteorological data
Traffic analysis
may include its application for:
roads
car parks
industrial hardstands
Project requirements and information
may include:
project specifications
contractual requirements
client's requirements
project site geological data
project site hydrological data
project site engineering survey data
project site cultural and heritage constraints
existing project design and drawings
Australian or other relevant standards
Analysis plan
may include:
human resource requirements
design hardware and software
coordination requirements
scheduling
review requirements
design process communication and reporting requirements
Preferred option factors
may include:
cost
site constraints
available resources
risk assessment of:
the existing conditions
the application of the analysis
maintainability of the completed works
Detailed traffic analysis
may include:
calculations, including:
level of service
capacity
drawings(or sketches)
risk assessment of:
the existing conditions
the conduct of the analysis
health, safety and environmental requirements
contribution to ancillary documentation, which may include:
analysis notes
supplementary drawings
outcomes and recommendations
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the completion and documentation of the detailed traffic analysis
implementation of procedures and techniques for the safe, effective and efficient completion and documentation of the detailed traffic analysis
the identification of the relevant information and scope of the work required to meet the required outcomes
the identification of viable options and the selection of he detailed traffic analysis that best meet the required outcomes
working with others to undertake and complete the and document the detailed traffic analysis
consistent successful completion and documentation of the detailed traffic analysis
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in a civil works environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge to apply in undertaking of the completion and documentation of the detailed traffic analysis
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate procedures and techniques for the safe, effective and efficient achievement of the required outcomes
identification of the relevant information and scope of the work required to meet the required outcomes
identification of viable options and the selection of the detailed traffic analysis that best meet the required outcomes
consistently achieving the required outcomes
first hand testimonial and documentary evidence of the candidate's:
working with others to undertake and complete the documentation of the detailed traffic analysis
provision of clear and timely required support and advice on the completion and documentation of the detailed traffic analysis
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the completion and documentation of the detailed traffic analysis
implementation of procedures and techniques for the safe, effective and efficient completion and documentation of the detailed traffic analysis
the identification of the relevant information and scope of the work required to meet the required outcomes
the identification of viable options and the selection of he detailed traffic analysis that best meet the required outcomes
working with others to undertake and complete the and document the detailed traffic analysis
consistent successful completion and documentation of the detailed traffic analysis
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in a civil works environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge to apply in undertaking of the completion and documentation of the detailed traffic analysis
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate procedures and techniques for the safe, effective and efficient achievement of the required outcomes
identification of the relevant information and scope of the work required to meet the required outcomes
identification of viable options and the selection of the detailed traffic analysis that best meet the required outcomes
consistently achieving the required outcomes
first hand testimonial and documentary evidence of the candidate's:
working with others to undertake and complete the documentation of the detailed traffic analysis
provision of clear and timely required support and advice on the completion and documentation of the detailed traffic analysis
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH218 | RIICWD526D | Prepare detailed traffic analysis | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W701 | RII50509 | Diploma of Civil Construction Design | Qualification |
| 6490 | 52476WA | Diploma of Public Works | Accredited course |