Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Maintain wind turbines
Maintain wind turbines
Unit of competency
National Code
UEPMNT315
UEPMNT315
State Code
OAI19
OAI19
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
15/05/2019
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
15/05/2019
Nominal Hours
90
Description
This unit involves the skills and knowledge required for the removal from service and overhaul of wind turbines.An overhaul includes a thorough examination of the wind turbine, with repairs or changes made, if required. This may mean taking apart the wind turbine to examine and repair it.Competency in this unit requires the ability to plan work, disassemble wind turbine, inspect wind turbine components, repair wind turbine and/or components and report on all completed work tasks. Individuals will, in general, work under supervision in an electrical, electronic and/or mechanical equipment repair workshop or onsite. Power generation maintenance personnel are typically trained and authorised to receive permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements.
Notes
Elements and Performance Criteria
1 Plan and prepare for work
- 1.1 Requirements including scope of work and assigned roles are identified from work orders and are confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures
- 1.2 Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
- 1.3 Resources are obtained and inspected for compliance with job specification
- 1.4 Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
- 1.5 Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
- 1.6 Work is planned, sequenced and prioritised, in accordance with workplace procedures
- 1.7 Potential hazards are identified and risk control measures are selected and implemented, in accordance with workplace procedures
- 1.8 Work area is prepared, in accordance with workplace procedures
2 Disassemble wind turbine
- 2.1 Isolations are confirmed, where appropriate, in accordance with workplace procedures
- 2.2 Wind turbine is disassembled, in accordance with workplace procedures and manufacturers' specifications
- 2.3 Wind turbine components are removed, in priority, in accordance with workplace procedures and manufacturers' specifications
- 2.4 Wind turbine disassembly is carried out, in accordance with workplace procedures
- 2.5 Components are measured, and clearances are taken, to determine conformity to manufacturer's limits, to ensure assembly is in accordance with workplace procedures and manufacturers' specifications
- 2.6 Measurements and clearances are recorded, in accordance with workplace procedures and manufacturers' specifications
3 Inspect windturbine components
- 3.1 Components are cleaned and inspected, in accordance with workplace procedures
- 3.2 Faults are identified and recorded, in accordance with workplace procedures
- 3.3 New components are inspected for compliance to manufacturers' specifications, in accordance with workplace procedures
- 3.4 All components are prepared for assembly, in accordance with workplace procedures
4 Repair windturbineor components
- 4.1 Repairs are carried out, in accordance with workplace procedures
- 4.2 Repairs are tested, and results are analysed, to ensure conformance to manufacturers' specifications, in accordance with workplace procedures
- 4.3 Data from testing is recorded, in accordance with workplace procedures
5 Complete work
- 5.1 Work is completed and appropriate personnel are notified, in accordance with workplace procedures
- 5.2 Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
- 5.3 Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures
- 5.4 Work completion details are finalised, in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE239 | UEPMNT315B | Maintain wind turbines | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEB3 | UEP50318 | Diploma of ESI Generation (Maintenance) | Qualification |
| BEB8 | UEP40518 | Certificate IV in ESI Generation Maintenance (Mechanical) | Qualification |