Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and set up clocks
Install and set up clocks
Unit of competency
National Code
MEM21016A
MEM21016A
State Code
D5469
D5469
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
10/06/2011
Field of Education
030715 - Precision Metalworking
Original Release Date
10/06/2011
Nominal Hours
18
Description
This unit of competency covers setting up and assembling pendulum clocks on site. It also covers testing and making running adjustments to ensure correct function and performance.
Notes
Elements and Performance Criteria
1. Handle clocks, shipment and delivery
- 1.1. Verify and agree clock location requirements (environmental and architectural) with customer
- 1.2. Prepare the clock for shipment/transport
- 1.3. Arrange delivery, as required
- 1.4. Pack parts to avoid damage in transit
- 1.5. Complete clock handover with customer
2. Assemble and install clocks
- 2.1. Select and use tools and equipment appropriately
- 2.2. Unpack components and verify completeness
- 2.3. Install and stabilise clock case using appropriate methods and fixings
- 2.4. Assemble clock
- 2.5. Verify clock functions
3. Determine in-beat and adjust pendulum oscillating systems
- 3.1. Conduct in-beat assessment
- 3.2. Identify in-beat adjustment method
- 3.3. Perform in-beat adjustment
- 3.4. Evaluate pendulum amplitude and action
4. Verify additional clock functions
- 4.1. Test and confirm correct striking and chiming sequence
- 4.2. Adjust, as required, to ensure correct tone and harmony
- 4.3. Set clock to time and confirm correct functioning of calendar and automatic night shut-off
5. Conduct basic clock regulation techniques
- 5.1. Set up and use timing equipment correctly
- 5.2. Verify pendulum rate correctly
- 5.3. Perform rate adjustments to achieve accurate timekeeping
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Prepare the clock
Prepare the clock may include:
separating and packaging of components
partial dismantling of clock (e.g. pendulum and weights)
secure gong rods/hammers
Clock handover
Clock handover may include:
informing customer of features and characteristics of clock
demonstrating winding and setting procedures for clock
informing customer of operation/switching of any automatic night silent/shut-off for chiming/striking mechanism
warranty information
recording date of installation
Tools and equipment
Tools and equipment may include:
hand tools
drills
spirit level
power tools
safety equipment, including personal protective equipment
cleaning equipment
Verify completeness
Verify completeness may include:
all components checked against packing slip/component list
case parts, pendulum, weights and key
striking and chiming rods, bells or tubes
Appropriate methods and fixings
Appropriate methods and fixings may include:
suitable location/position identified (e.g. level, stable, drafts and people traffic)
wedges
floor and wall fixings
Clock functions
Clock functions may include:
pendulum in-beat (e.g. automatic beat)
striking and chiming
winding and setting
calendar-moon phase
In-beat assessment
In-beat assessment may include:
clock secure and level position
pendulum assembly complete and correctly attached
listen for evidence of even tick
In-beat adjustment method
In-beat adjustment method may include:
friction crutch
cam wheel
bending crutch
automatic beat adjuster
Rate adjustments
Rate adjustments may include:
effect of changing pendulum length
(shortening = gain, lengthening = loss)
methods of adjusting bob position (e.g. screw thread)
French devices (e.g. adjustable suspension)
weight trays
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Prepare the clock
Prepare the clock may include:
separating and packaging of components
partial dismantling of clock (e.g. pendulum and weights)
secure gong rods/hammers
Clock handover
Clock handover may include:
informing customer of features and characteristics of clock
demonstrating winding and setting procedures for clock
informing customer of operation/switching of any automatic night silent/shut-off for chiming/striking mechanism
warranty information
recording date of installation
Tools and equipment
Tools and equipment may include:
hand tools
drills
spirit level
power tools
safety equipment, including personal protective equipment
cleaning equipment
Verify completeness
Verify completeness may include:
all components checked against packing slip/component list
case parts, pendulum, weights and key
striking and chiming rods, bells or tubes
Appropriate methods and fixings
Appropriate methods and fixings may include:
suitable location/position identified (e.g. level, stable, drafts and people traffic)
wedges
floor and wall fixings
Clock functions
Clock functions may include:
pendulum in-beat (e.g. automatic beat)
striking and chiming
winding and setting
calendar-moon phase
In-beat assessment
In-beat assessment may include:
clock secure and level position
pendulum assembly complete and correctly attached
listen for evidence of even tick
In-beat adjustment method
In-beat adjustment method may include:
friction crutch
cam wheel
bending crutch
automatic beat adjuster
Rate adjustments
Rate adjustments may include:
effect of changing pendulum length
(shortening = gain, lengthening = loss)
methods of adjusting bob position (e.g. screw thread)
French devices (e.g. adjustable suspension)
weight trays
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to install and set up clocks to industry standards, manufacturer specifications and in accordance with safety regulations and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently:
safely package and handle clock components and cases
set up and install pendulum clocks
assemble clock components
test and adjust clock functions and performance.
Context of and specific resources for assessment
Assessment may occur on the job or in a simulated working environment. Access is required to real or appropriately simulated situations, including work areas, materials and equipment, and information on workplace practices and OHS practices.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the MEM05 Metal and Engineering Training Package.
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge.
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application.
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process.
Assessment must confirm a reasonable inference that competency is not only able to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
Assessment may be in conjunction with assessment of other units of competency where required.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to install and set up clocks to industry standards, manufacturer specifications and in accordance with safety regulations and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently:
safely package and handle clock components and cases
set up and install pendulum clocks
assemble clock components
test and adjust clock functions and performance.
Context of and specific resources for assessment
Assessment may occur on the job or in a simulated working environment. Access is required to real or appropriately simulated situations, including work areas, materials and equipment, and information on workplace practices and OHS practices.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the MEM05 Metal and Engineering Training Package.
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge.
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application.
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process.
Assessment must confirm a reasonable inference that competency is not only able to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
Assessment may be in conjunction with assessment of other units of competency where required.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAT80 | MEM21016 | Install and set up clocks | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W245 | MEM40105 | Certificate IV in Engineering | Qualification |
| W247 | MEM50105 | Diploma of Engineering - Advanced Trade | Qualification |
| W946 | MEM31010 | Certificate III in Watch and Clock Service and Repair | Qualification |