Unit of competency Outline
Date retreived
23/07/2026 10:38 PM AWST
23/07/2026 10:38 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply and trim decorative additions to shopfittings and components
Apply and trim decorative additions to shopfittings and components
Unit of competency
National Code
CPCCSH3005
CPCCSH3005
State Code
BBB02
BBB02
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
23/01/2017
Field of Education
030113 - Cabinet Making
Original Release Date
23/01/2017
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to apply and trim decorative panelling, frames, borders and mirrors to shopfittings and components according to specified designs. It covers setting out the position of decorative additions, fixing them into place, and trimming them to ensure a quality finish.The unit supports shopfitters who may work off site on units being fabricated for installation, or on site on installed units and internal walls, working concurrently with other shopfitting work. Work must be scheduled to accommodate both client requirements, where the shop is operational, and the requirements of other shopfitters and associated contractors.No licensing, legislative, regulatory or certification requirements apply to this unit of competency at the time of endorsement.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Job requirements are obtained, confirmed and applied to planning.
- 1.2 Work site is inspected, conditions and hazards are identified and reported as required, and health and safetyrequirements are confirmed with relevant personnel and applied to planning.
- 1.3 Type and quantity of decorative additions to be applied are confirmed, obtained, prepared, safely handled and located ready for use.
- 1.4 Substrate is confirmed and method for fixing decorative additions is identified.
- 1.5 Tools and equipmentare selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.
- 1.6 Position of decorative additions is set out according to specifications and confirmed with client.
2 Set out and cut decorative additions.
- 2.1 Lengths of decorative additions are set out and marked for locations according to job specifications.
- 2.2 Plan is drawn to develop a true mitre for a compound angle or for a mitre of material of different widths, and angles are calculated by dissection.
- 2.3 Decorative additions including curved work are cut to required size according to manufacturer specifications.
3 Carry out fixing processes and finishing techniques.
- 3.1 Preparation requirements for fixing of additions are carried out according to job requirements.
- 3.2 Decorative additions are fitted and fixed according to job requirements.
- 3.3 Applied additions are trimmed and finished according to job requirements.
4 Clean up.
- 4.1 Work area is cleared and waste material disposed of according to work site requirements.
- 4.2 Tools and equipment are cleaned, maintained and stored according to workplace requirements.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9519 | CPCCSH3005A | Apply and trim decorative finishes | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCM25 | CPCSHP3005 | Apply and trim decorative additions to shopfittings and components | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BDJ4 | CPC30116 | Certificate III in Shopfitting | Qualification |