Unit of competency Outline

Date retreived
22/07/2026 9:48 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Apply reinforcement schedule

Apply reinforcement schedule

Unit of competency
National Code
CPCCSF3001A
State Code
W9508
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
20/06/2014
Nominal Hours
16
Description
This unit of competency specifies the outcomes required to interpret the reinforcement schedule and use it to confirm and locate materials to support construction activities.It includes planning and preparation for work, reading and interpretation of the schedule, and use of the schedule to confirm materials, locate materials for construction use and provide information to others on site.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.
  • 1.2. Reinforced concrete construction schedule is identified from project schedule.
  • 1.3. Elements of structure are identified from project construction schedule and job drawings.
  • 1.4. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.5. Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
2. Read and interpret schedule.
  • 2.1. Structural element to be constructed is confirmed from site and structural detail drawings.
  • 2.2. Reinforcement schedule is read to identify the appropriate reinforcement type for the structural element.
  • 2.3. Number of reinforcement pieces/sheets is identified from structural detail drawings.
  • 2.4. Reinforcement schedule is read to identify coding and number related to labels.
  • 2.5. Discrepancies in coding and numbering are identified and situation is reported to schedule contact for clarification.
3. Check contents of bundles.
  • 3.1. Content of reinforcement material bundles is checked for conformity to schedule and proposed structural element.
  • 3.2. Discrepancies between the schedule and actual material quantities are investigated and resolved or reported.
  • 3.3. Discrepancies between the schedule and actual material shape, size or length are investigated and resolved or reported.
  • 3.4. Cranked or bent items of reinforcement are identified, segregated and reported.
  • 3.5. Schedule is marked where content conforms to schedule and structural element's requirements.
4. Locate reinforcement for element construction.
  • 4.1. Reinforcement is marked or placed and noted ready for transportation to element location.
  • 4.2. Reinforcement is directed to structural location for placement and fixing.
5. Communicate schedule information.
  • 5.1. Job sequencing schedule detail is communicated to steel fixers and team members to ensure efficient work practices.
  • 5.2. Changes to job sequencing schedule are recorded as per site requirements.
  • 5.3. Work completion procedures are identified and relevant personnel notified when finished, as per site requirements.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to the application of reinforcement schedules
relevant Australian standards
safe work procedures relating to the application of reinforcement schedules
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Reinforced concrete construction schedule:
information includes:
grade of steel reinforcing
length of material
location for material, size and shape of bars
number of bars in a bundle
shape of formed bars
size of mesh
surface markings
type of steel bars, cranks and bends
structural elements include:
beams
columns
footings
slabs
walls.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
lighting
power equipment
power leads and sources
trip hazards
work site visitors and the public
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Environmental requirements include:
clean-up management
dust and noise
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering the applicable Acts, regulations and codes of practice.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply of relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools and equipment
communicate and work effectively and safely with others
for a minimum of two different sites:
confirm the reinforcement material to the schedule
direct the location of the reinforcement materials for element construction
communicate schedule information and variations to steel fixers.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1889 BCGSF3001B Apply reinforcement schedule Unit of competency
Replaced By
State Code National Code Title Type
OAP40 CPCCSF3001 Apply reinforcement schedule Unit of competency