Unit of competency Outline

Date retreived
23/07/2026 3:51 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Moisture test timber and concrete floors

Moisture test timber and concrete floors

Unit of competency
National Code
LMFFL2004A
State Code
W8527
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
11/05/2009
State Implementation and Classification
Approved Date
08/04/2011
Field of Education
040301 - Building Science And Technology
Original Release Date
08/04/2011
Nominal Hours
40
Description
This unit specifies the outcomes required to moisture test and formally report on the condition of timber and concrete floors.
Notes
Elements and Performance Criteria
1. Prepare for work
  • 1.1. Applicable legislative, OHS and organisational requirements relevant to moisture testing timber and concrete are verified and complied with
  • 1.2. Customer enquiry and relevant information is consulted to determine the type of proposed flooring operation and other work requirements
  • 1.3. Moisture content requirements for the proposed flooring are determined from manufacturer or workplace information
  • 1.4. Tools, equipment and required materials are obtained and prepared for the work
2. Conduct moisture testing on timber flooring and components
  • 2.1. The type of floor construction materials and the building floor structure and substructure are identified
  • 2.2. Timber flooring is visually inspected to identify irregularities in moisture content.
  • 2.3. Ventilation flow is confirmed and irregularities noted
  • 2.4. Floor joists, bearers and stumps are visually checked for moisture content irregularities
  • 2.5. Moisture testing of timber flooring, floor joists, bearers and stumps EMC is completed in accordance with the approved process and standard
3. Conduct moisture testing on concrete floors
  • 3.1. The type of floor construction materials and the building floor structure and substructure are identified
  • 3.2. Concrete floor is visually inspected to identify irregularities in moisture content.
  • 3.3. Moisture testing is completed in accordance with the approved process and Australian standard
4. Notify findings of moisture tests
  • 4.1. Notification of the findings of the moisture tests is completed in accordance with the current and relevant Australian standards
  • 4.2. Copies of the notification are sent to appropriate personnel and suitably filed following workplace procedures
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Legislative requirements
are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage
OHS requirements
are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination, control of hazardous materials and substances, manual handling including lifting and carrying
Organisational requirements
may include but not be limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)
Relevant information
Workplace procedures relating to the use and operation of moisture testing tools and equipment
Workplace instructions, including job sheets, plans, drawings and designs
Workplace procedures relating to notification and communications
Manufacturer instructions for the use of moisture testing equipment and materials
Tools and equipment
are to include electrical resistance meter, timber probe, tape measure, hygrometer, thermometer probe, temperature gauge, relative humidity, electric drill and masonry drill bits
Materials
may include timber strip flooring, construction sheet flooring, concrete floors, above grade, on grade and below grade floors
Timber moisture tests
are to include tests for moisture content, of timber flooring, floor joists, bearers and stumps rotting, insect attack and cross flow ventilation
Concrete moisture tests
are to include checks for moisture, damage to expansion joint, concrete surface for weakness or damage and for the presence of curing agents
Inspection notifications
are to cover the type and number of moisture test completed, inspection findings, suggested remedies to any faults identified and recommendations for the selected flooring








EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for sub-floor inspection
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment
Follow work instructions, operating procedures and inspection practices to:
minimise the risk of injury to self and others
prevent damage to goods, equipment and products
maintain required production output and product quality
Complete a minimum of:
one electrical resistance moisture test on timber flooring, floor joists, bearers and stumps including written notification of the test results
one hygrometer moisture test on, concrete flooring including written notification of test results
one capacitance moisture test on, concrete flooring including written notification of test results
one calcium chloride test on, concrete flooring including written notification of test results
Work effectively with others
Modify activities to cater for variations in workplace contexts and environment

Context of, and specific resources for assessment
The application of competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to comply with relevant regulatory or Australian Standards requirements
The following resources should be made available:
workplace location or simulated workplace
testing equipment, tools and materials relevant to moisture testing
specifications and work instructions

Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the Furnishing Industry Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
Assessment may be applied under project related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other related units of competency, e.g. Plan and cost flooring technology work


Replaced By
State Code National Code Title Type
WI334 MSFFL2004 Moisture test timber and concrete floors Unit of competency
No information