Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Implement ballast unloading
Implement ballast unloading
Unit of competency
National Code
TLIS3025
TLIS3025
State Code
AVH68
AVH68
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
030717 - Plant And Machine Operations
Original Release Date
23/02/2016
Nominal Hours
35
Description
This unit involves the skills and knowledge required to implement ballast unloading in accordance with safeworking and regulatory requirements, and workplace procedures.It includes determining the job requirements, carrying out the unloading activity in accordance with work orders, and completing all required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under limited supervision, generally within a team environment. It involves the application of routine operational principles and procedures when implementing ballast unloading, as part of workplace activities across a variety of operational context within the Australian rail system.Operators of mechanised equipment must have undertaken training and, where appropriate, hold the relevant licence, permit or certificate and be recognised as competent for the class of machinery being used.
Notes
Elements and Performance Criteria
1 Determine job requirements
- 1.1 Work requirements are determined for new ballast work and/or repair of existing ballast
- 1.2 Hazards are identified, risks are assessed and control measures are implemented
- 1.3 Obstacles in work area are identified and removal or protection are organised as necessary to ensure smooth workflow in accordance with workplace procedures
- 1.4 Resources are organised to meet the scope of the job and appropriate work methods are selected
- 1.5 Ballast quantities are determined
2 Undertake ballast unloading
- 2.1 Site communications are established and agreed to ensure safe and efficient working conditions
- 2.2 Ballast unloading operation is implemented to ensure appropriate flow rates and extent
- 2.3 Ballast is distributed by manual and/or mechanical methods to allow safe operation of trains
- 2.4 Ballast is removed from sensitive infrastructure to ensure safe operation of trains and safety of public
3 Complete documentation
- 3.1 Required documentation procedures and processes are confirmed
- 3.2 Documentation is filled in legibly and proofread
- 3.3 Documentation is processed in accordance with workplace requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D5351 | TLIS3025A | Implement ballast unloading | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHV6 | TLI37122 | Certificate III in Rail Infrastructure | Qualification |
| BGM6 | TLI37120 | Certificate III in Rail Infrastructure | Qualification |
| BHI6 | TLI37121 | Certificate III in Rail Infrastructure | Qualification |
| AWQ2 | TLI32515 | Certificate III in Rail Infrastructure | Qualification |
| AWQ7 | TLI31815 | Certificate III in Rail Track Surfacing | Qualification |