Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Implement and manage wastewater treatment processes monitoring program

Implement and manage wastewater treatment processes monitoring program

Unit of competency
National Code
NWP547B
State Code
D1988
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
2.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
06/11/2014
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
06/11/2014
Nominal Hours
120
Description
This unit of competency describes the outcomes required to implement and manage the treatment management plan for wastewater treatment activities.
Notes
Elements and Performance Criteria
1Implement and coordinate wastewater treatment process monitoring program.
  • 1.1 Confirm performance measures for the wastewater treatment management plan.
  • 1.2 Develop the implementation plan in conformance with legislation, organisational requirements and environmental factors.
  • 1.3 Design and implement the monitoring and testing programs according to the objectives of the wastewater treatment management plan.
  • 1.4 Analyse, interpret and report testing results according to legislative and enterprise requirements.
  • 1.5 Identify and investigate problems and/or potential problems and report results and recommendations according to legislative and enterprise requirements.
  • 1.6 Store results and reports according to legislative and enterprise requirements.
2Monitor and optimise the process and production.
  • 2.1 Monitor treatment process resource usage according to the wastewater treatment management plan.
  • 2.2 Implement emergency action plans according to the wastewater treatment management plan.
  • 2.3 Identify, report and recommend opportunities for process performance improvements according to the wastewater treatment management plan.
  • 2.4 Provide advice and guidance to effluent/sludge customers and stakeholders according to legislative and enterprise requirements.
  • 2.5 Review, interpret and action stakeholder and customer requirements according to the wastewater treatment management plan.
  • 2.6 Identify and investigate breaches of the wastewater treatment management plan provisions with the results and/or recommendations reported and actioned according to legislative and enterprise requirements.
3Report on implementation and monitoring of the plan.
  • 3.1 Identify, investigate and report deviations from planned treatment parameters and quality and management plan requirements.
  • 3.2 Review objectives of the management plan.
  • 3.3 Make recommendations for changes to plan objectives and operational procedures.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Legislation may include:
relevant federal legislation
relevant state or territory legislation
relevant local government by-laws
Australian Standards
Environmental factors that impact on the treatment process may include:
Flora
Fauna
organic and inorganic chemicals
sediment impacts in discharge environment
nutrients
oils and greases
pesticides
trade waste
communities activities and attitudes
natural events (e.g. floods, fires)
industry activities and attitudes
micro-organisms
odour dispersion
Monitoring may include:
process control monitoring
mechanical and electrical maintenance schedules
mechanical and electrical equipment condition
licensing requirements
legislative requirements
chemical, physical, biological and microbiological quality
Testing may include but not be limited by:
physical analysis of wastewater:
pH
conductivity
suspended solids
chemical analysis of wastewater
chlorine
nutrients
chemical oxygen demand
heavy metals
microbiological analyses:
coliforms
plate counts
algae identification and counts
physical measures:
power
chemicals
wastewater flows
sludge volumes
mechanical testing:
vibration
noise
temperature
Customers may include:
individual consumers
regulators
suppliers
government
community or specific enterprises
industry
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to implement and manage the treatment management plan for wastewater treatment activities including:
gathering, interpreting and synthesising information (including historical data, current legislation and standards, stakeholder views and the results of wastewater treatment testing and monitoring) to underpin the implementation of the wastewater treatment processes management plan
planning and implementing testing processes and programs
monitoring and evaluating the outcomes of the wastewater treatment processes management plan
providing advice and communicating with stakeholders and users
preparing reports and recommendations for future action
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
No information
State Code National Code Title Type
D247 NWP50107 Diploma of Water Operations Qualification