Unit of competency Outline
Date retreived
23/07/2026 9:57 AM AWST
23/07/2026 9:57 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Undertake surveying of monitoring sites
Undertake surveying of monitoring sites
Unit of competency
National Code
NWPHYD015
NWPHYD015
State Code
AVZ15
AVZ15
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
15/04/2016
Field of Education
010711 - Hydrology
Original Release Date
15/04/2016
Nominal Hours
60
Description
This unit of competency describes the skills required to use appropriate survey equipment to collect survey data at monitoring sites and to process and manage the data for hydrographic purposes.This unit applies to hydrographers employed by the water industry and water operators involved in the monitoring of all the elements of the water cycle and their impact on the related environment.The skills and knowledge described in this unit must be applied within the legislative, regulatory and policy environment in which they are carried out. Organisational policies and procedures must be consulted and adhered to, particularly those relating to WHS, Bureau of Meteorology, World Meteorological Organisation and Australian Standards.Those undertaking this unit would work autonomously, supervising staff, while performing complex tasks in a broad range of contexts, that could be unpredictable, including remote, confined spaces, near water and/or at heights.No licensing, legislative or certification requirements apply to unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and assess survey requirements
- 1.1 Identify the survey objectives and any required standard processes and software.
- 1.2 Identify the location and value of survey reference marks from maps and plans.
- 1.3 Choose and justify appropriate survey techniques for specific hydraulic conditions and hydrographic purposes.
- 1.4 Identify and evaluate the source of levelling errors and misclosures.
- 1.5 Plan and manage the logistics and personnel to ensure effective outcomes and resource management.
- 1.6 Apply correct care procedure for storage, transport and use of survey equipment.
- 1.7 Assess and address WHS issues that may be encountered during the surveying exercise, taking appropriate risk management strategies.
- 1.8 Apply for and confirm authorisations for entry to property.
2. Operate survey equipment
- 2.1 Select, set up and prepare survey equipment for use and check level of accuracy.
- 2.2 Use mathematical techniques to check for correct operation.
- 2.3 Use suitable survey equipment.
3. Select and survey monitoring sites
- 3.1 Identify required survey reference benchmarks.
- 3.2 Establish cease-to-flow level of controlling feature.
- 3.3 Identify and assess high-flow cross-section and sectional control by survey.
- 3.4 Survey sections of channels to determine the profile of the channel in the gauging station reach.
- 3.5 Identify and assess monitoring site survey reference points.
- 3.6 Establish benchmark and survey to Australian Height Datum.
- 3.7 Use different surveying techniques.
4. Document survey and data results
- 4.1 Verify results in corporate database.
- 4.2 Document and store results.
- 4.3 Produce a plot or plan of survey results.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D4830 | NWP504A | Collect and manage hydrometric station survey data | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCW60 | NWPHYD009 | Undertake surveying of monitoring sites | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AYX1 | NWP40515 | Certificate IV in Water Industry Operations | Qualification |
| AYW5 | NWP50715 | Diploma of Water Industry Operations | Qualification |
| BEG3 | NWP50118 | Diploma of Water Industry Operations | Qualification |