Unit of competency Outline
Date retreived
23/07/2026 12:31 AM AWST
23/07/2026 12:31 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install ceiling insulation
Install ceiling insulation
Unit of competency
National Code
CPCCPB3027A
CPCCPB3027A
State Code
WA769
WA769
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
09/02/2011
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
09/02/2011
Nominal Hours
30
Description
This unit of competency specifies the outcomes required to install ceiling insulation to comply with safety requirements as well as environmental requirements for energy efficiency ratings in accordance with sustainable building practices. It includes identifying and complying with applicable legislative requirements, planning and preparing for work, installing ceiling insulation, and completing installation and post-work clean-up activities.This unit may be an essential requirement for registration to install ceiling insulation. Registration requirements may vary in different states and territories.At the time of endorsement, this unit meets the regulatory requirements of the Government's Energy Efficient HomesPackage.
Notes
Elements and Performance Criteria
1. Identify legislative, regulatory, and organisational requirements.
- 1.1. Safety and applicable legislative requirements are identified and complied with.
- 1.2. Organisational environmental and safety plans and policies are identified and complied with according to organisational requirements.
- 1.3. Safe work methods and practices are identified and applied according to organisational safety plans and policies.
- 1.4. Environmental requirements are identified and applied according to organisational environmental plans and regulatory requirements.
- 1.5. Emergency response and evacuation procedures are identified and carried out when required.
2. Plan and prepare for installing insulation.
- 2.1. Work instructions and relevant information are obtained and confirmed for planning and preparation purposes.
- 2.2. Risk assessment is undertaken to identify existing risks and hazards in the work area, including electrical risks and hazards.
- 2.3. Identified risks are documented and appropriate response is undertaken according to safety requirements.
- 2.4. Ceiling insulating material and insulation requirements are confirmed in accordance with work specifications.
- 2.5. Appropriate personal protective equipment (PPE) and clothing are identified, correctly fitted, and used according to organisational policies and procedures.
- 2.6. Tools and equipment are selected appropriate to the requirements of the work, confirmed for serviceability, and reported for repair or replacement where not serviceable.
- 2.7. Associated material is determined and organised ready for use according to quality requirements and work plans and specifications.
3. Install ceiling insulation.
- 3.1. Insulation material is accurately measured to minimise waste.
- 3.2. Insulation is installed using approved processes and handling techniques according to manufacturer specifications and relevant electrical and building regulations.
- 3.3. Dust-suppression procedures are used to minimise health risk in work area to self and others.
- 3.4. Insulation is installed safely without damage or distortion of the surrounding environment, electrical and other services and in a manner that maximises safety of self and others.
- 3.5. Variations and difficulties affecting performance or quality requirements of own work are identified and reported.
4. Complete installation.
- 4.1. Final inspections are conducted to ensure installed ceiling insulation conforms to job and manufacturer specifications.
- 4.2. Notification of work completion is made to designated personnel according to organisational procedures.
- 4.3. Work area is cleaned and materials are disposed of, reused or recycled according to organisational, safety and environmental requirements.
- 4.4. Tools and equipment are cleaned, checked, maintained and stored according to manufacturer specifications and organisational procedures.
- 4.5. Malfunctions, faults, wear or damage to tools, equipment and site are accurately documented and reported for repair or replacement according to organisational procedures.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Safety requirements are to be in accordance with commonwealth, state and territory legislation and regulations, organisational safety plans and policies, and include:
emergency procedures, including evacuation and provision of first aid
hazard control procedures
hazardous materials and substances
electrical hazards
PPE prescribed under legislation, regulations and workplace policies and practices
reporting hazards, incidents, injuries, near misses and identified ACM
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
manual handling
concealed services, including water, power and gas
lighting
traffic control
restricted access barriers
trip hazards
power sources and leads
power tools, including cutting tools
workplace visitors and the public
working at heights
working in enclosed areas
working in proximity to others
types of fire and use of firefighting equipment
use of tools and equipment
workplace environmental requirements.
Commonwealth, state and territory legislative requirements include:
Australian standards, including working at heights requirements:
AS 6001:1999 Working platforms for domestic application
AS 1576 Scaffolding
AS/NZS4576:1995 Guidelines for scaffolding
conduct on-site operational assessment of electrical risk and implement control measures to prevent it
construction industry OHS standards and guidelines
duty of care
health and safety representatives, committees and supervisors
licences, tickets and certificates of competency
National Code of Practice for Induction Training for Construction Work
national safety standards
OHS and welfare Acts and regulations
safety codes of practice, and JSA and safe work method statements.
Organisational requirements relate to:
access and equity policy, principles and practice
client service standards
defined resource parameters
emergency and evacuation procedures
employer and employee rights and responsibilities
OHS policies, procedures and programs
organisational goals, objectives, plans, systems and processes
organisational policies and procedures, including personnel practices and guidelines
own role and responsibility
quality and continuous improvement processes and standards.
Safe work methods and practices relate to:
access to site amenities, such as drinking water and toilets
avoiding unnecessary risks
awareness of existing and potential hazards
day to day observation of OHS policies and procedures
general requirements for safe use of plant, tools and equipment
general requirements for use of PPE and clothing
housekeeping to ensure a clean, tidy and safe work area
no drugs and alcohol at work
preventing bullying and harassment
risk assessment
smoking in designated areas
storage and removal of debris
use of plant and equipment guards.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management and recycling.
Emergency response and evacuation procedures include:
emergencies, such as fire, toxic and/or flammable vapours emission, vehicle/mobile plant accident, structural collapse, chemical spill and injury to personnel, including electric shock
evacuation
extinguishing fires
first aid.
Work instructions may include:
completion dates
work requirements and tasks
procedures for installing insulation in relation to electrical equipment
electrical isolation and tagging of work area
site access information
risk assessment documentation
safety measures for electrical hazards
specific client and site requirements
work schedules.
Information includes:
diagrams or sketches
drawings, plans and specifications
instructions issued by authorised organisational or external personnel
log books
manufacturer specifications and instructions
MSDS
memos
regulatory and legislative requirements pertaining to installing ceiling insulation
relevant Australian standards
safe work procedures relating to installing ceiling insulation
signage
suppliers' information
verbal and written instructions, including diagrams
work bulletins.
Planning and preparation relate to:
assessing conditions and hazards
determining work requirements and safety plans and policies
identifying equipment defects
inspecting workplaces.
Hazards may include:
asbestos dust and fibres
asbestos containing materials
enclosed areas (e.g. heat stress)
dust from fibreglass and other insulation materials
electrical hazards
inability of ceiling structure to support additional weight of insulation materials and installers
manual handling hazards (e.g. knee and back injury)
noise, plant and equipment hazards
slips, trips and falls
synthetic mineral fibres
working at heights.
Electrical risks and hazards include:
unenclosed connections
unenclosed conductors
damaged cable sheaths
exposed conductors
wiring that is likely to be adversely affected by retrospective installation
not following specified clearances/insulation barriers around recessed luminaires
not observing operating temperature limit of electrical cables
wiring system age
using polystyrene, polyurethane and metallic foil-based products.
Appropriate response may include:
engaging a licensed electrician to evaluate suitability of wiring
isolating and tagging work area
seeking changes to work instructions
deciding not to undertake work
reporting to designated personnel
following OHS legislative requirements.
Ceiling insulating material includes:
batts and blankets:
glasswool
glasswool/rockwool - foil attached
polyester
rockwool
sheep's wool
boards:
expanded polystyrene
expanded polystyrene - foil attached
extruded polystyrene (styrofoam)
loose fills:
cellulose fibre
granulated rockwool
sheep's wool
reflective:
foil batts
multi-layer reflective
roll-form reflective foil laminate (RFL).
Insulation requirements:
as determined by BCA and Australian standards AS/NZS 4859.1, AS 4200.1, AS 4200.2 (2006)
include:
approved system radiative transfer (RT) calculations
downward R-values
upward R-values.
Personal protective equipment includes:
aprons
arm guards
caps
dust masks and respirators
ear muffs and plugs
gloves
hard hats
harnesses and ropes
high visibility retro reflective vests
jackets
overalls
safety glasses and goggles
steel-capped boots
UV protective clothing and sunscreen.
Tools and equipment:
include:
broad knives
brooms
caulking guns
electric screw guns
hammers
hand saws
keyhole saws
ladders
manual levelling devices
measuring tapes and rules
nail bags
power drills
power leads
power saws
spanners
spirit levels
T squares
taping knives
tin snips
trestles
trowels
non-conductive and insulated tools
may include:
air compressors and hoses
C clamps
docking saw and drop saws
laser levelling devices
masonry drills
nail guns
pop riveters
saw stools
scaffolding and planks.
Associated materials include:
adhesive
ceiling products
downlight covers
fibrous plaster
jointing tape
metal and aluminium type products
nails
non-conductive fixing devices
plasterboard
screws
sealants
staples
steel safety mesh.
Quality requirements incorporate relevant regulations and include:
Australian standards
internal organisational quality policy and standards
manufacturer specifications
workplace operations and procedures.
Installation includes:
employer-approved manual handling techniques
manufacturer recommended methods and fasteners
maintaining specified clearances from recessed luminaires
installing thermal insulation barriers to luminaires and other electrical equipment according to manufacturer's recommendations and applicable standards, including AS/NZS3000:2007
work sequences and fixing processes that minimise waste and maximise material.
Electrical and building regulations may include:
BCA
Australian standards such as:
AS 3999:1992 Thermal insulation of dwellings - Bulk insulation - Installation requirements
AS/NZS 4859.1:2002 Materials for the thermal insulation of buildings - Testing and labelling of insulation
AS/NZS 4200 Pliable building membranes and underlays - reflective foils
AS/NZS 4200.1 Part 1: Materials - reflective foils
AS/NZS 4200.2 Part 2: Installation requirements - reflective foils
AS 1366.1 Rigid cellular polyurethane (RC/PUR) - other insulations
AS 1366.2 Rigid cellular polyisocyanurate (RC/PIR) - other insulations
AS 1366.3 Rigid cellular polystyrene moulded (RC/PS-M) - other insulations
AS 1366.4 Rigid cellular polystyrene - extruded (RC/PS)
AS 4073 Urea-formaldehyde foam thermal insulation - In situ set foam BCA insulation levels - Other insulations.
AS/NZS 3000:2007 (with Amd 1) Wiring Rules, in particular Clause 4.5.2.3.
Materials include:
hazardous materials
non-toxic materials.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Safety requirements are to be in accordance with commonwealth, state and territory legislation and regulations, organisational safety plans and policies, and include:
emergency procedures, including evacuation and provision of first aid
hazard control procedures
hazardous materials and substances
electrical hazards
PPE prescribed under legislation, regulations and workplace policies and practices
reporting hazards, incidents, injuries, near misses and identified ACM
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
manual handling
concealed services, including water, power and gas
lighting
traffic control
restricted access barriers
trip hazards
power sources and leads
power tools, including cutting tools
workplace visitors and the public
working at heights
working in enclosed areas
working in proximity to others
types of fire and use of firefighting equipment
use of tools and equipment
workplace environmental requirements.
Commonwealth, state and territory legislative requirements include:
Australian standards, including working at heights requirements:
AS 6001:1999 Working platforms for domestic application
AS 1576 Scaffolding
AS/NZS4576:1995 Guidelines for scaffolding
conduct on-site operational assessment of electrical risk and implement control measures to prevent it
construction industry OHS standards and guidelines
duty of care
health and safety representatives, committees and supervisors
licences, tickets and certificates of competency
National Code of Practice for Induction Training for Construction Work
national safety standards
OHS and welfare Acts and regulations
safety codes of practice, and JSA and safe work method statements.
Organisational requirements relate to:
access and equity policy, principles and practice
client service standards
defined resource parameters
emergency and evacuation procedures
employer and employee rights and responsibilities
OHS policies, procedures and programs
organisational goals, objectives, plans, systems and processes
organisational policies and procedures, including personnel practices and guidelines
own role and responsibility
quality and continuous improvement processes and standards.
Safe work methods and practices relate to:
access to site amenities, such as drinking water and toilets
avoiding unnecessary risks
awareness of existing and potential hazards
day to day observation of OHS policies and procedures
general requirements for safe use of plant, tools and equipment
general requirements for use of PPE and clothing
housekeeping to ensure a clean, tidy and safe work area
no drugs and alcohol at work
preventing bullying and harassment
risk assessment
smoking in designated areas
storage and removal of debris
use of plant and equipment guards.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management and recycling.
Emergency response and evacuation procedures include:
emergencies, such as fire, toxic and/or flammable vapours emission, vehicle/mobile plant accident, structural collapse, chemical spill and injury to personnel, including electric shock
evacuation
extinguishing fires
first aid.
Work instructions may include:
completion dates
work requirements and tasks
procedures for installing insulation in relation to electrical equipment
electrical isolation and tagging of work area
site access information
risk assessment documentation
safety measures for electrical hazards
specific client and site requirements
work schedules.
Information includes:
diagrams or sketches
drawings, plans and specifications
instructions issued by authorised organisational or external personnel
log books
manufacturer specifications and instructions
MSDS
memos
regulatory and legislative requirements pertaining to installing ceiling insulation
relevant Australian standards
safe work procedures relating to installing ceiling insulation
signage
suppliers' information
verbal and written instructions, including diagrams
work bulletins.
Planning and preparation relate to:
assessing conditions and hazards
determining work requirements and safety plans and policies
identifying equipment defects
inspecting workplaces.
Hazards may include:
asbestos dust and fibres
asbestos containing materials
enclosed areas (e.g. heat stress)
dust from fibreglass and other insulation materials
electrical hazards
inability of ceiling structure to support additional weight of insulation materials and installers
manual handling hazards (e.g. knee and back injury)
noise, plant and equipment hazards
slips, trips and falls
synthetic mineral fibres
working at heights.
Electrical risks and hazards include:
unenclosed connections
unenclosed conductors
damaged cable sheaths
exposed conductors
wiring that is likely to be adversely affected by retrospective installation
not following specified clearances/insulation barriers around recessed luminaires
not observing operating temperature limit of electrical cables
wiring system age
using polystyrene, polyurethane and metallic foil-based products.
Appropriate response may include:
engaging a licensed electrician to evaluate suitability of wiring
isolating and tagging work area
seeking changes to work instructions
deciding not to undertake work
reporting to designated personnel
following OHS legislative requirements.
Ceiling insulating material includes:
batts and blankets:
glasswool
glasswool/rockwool - foil attached
polyester
rockwool
sheep's wool
boards:
expanded polystyrene
expanded polystyrene - foil attached
extruded polystyrene (styrofoam)
loose fills:
cellulose fibre
granulated rockwool
sheep's wool
reflective:
foil batts
multi-layer reflective
roll-form reflective foil laminate (RFL).
Insulation requirements:
as determined by BCA and Australian standards AS/NZS 4859.1, AS 4200.1, AS 4200.2 (2006)
include:
approved system radiative transfer (RT) calculations
downward R-values
upward R-values.
Personal protective equipment includes:
aprons
arm guards
caps
dust masks and respirators
ear muffs and plugs
gloves
hard hats
harnesses and ropes
high visibility retro reflective vests
jackets
overalls
safety glasses and goggles
steel-capped boots
UV protective clothing and sunscreen.
Tools and equipment:
include:
broad knives
brooms
caulking guns
electric screw guns
hammers
hand saws
keyhole saws
ladders
manual levelling devices
measuring tapes and rules
nail bags
power drills
power leads
power saws
spanners
spirit levels
T squares
taping knives
tin snips
trestles
trowels
non-conductive and insulated tools
may include:
air compressors and hoses
C clamps
docking saw and drop saws
laser levelling devices
masonry drills
nail guns
pop riveters
saw stools
scaffolding and planks.
Associated materials include:
adhesive
ceiling products
downlight covers
fibrous plaster
jointing tape
metal and aluminium type products
nails
non-conductive fixing devices
plasterboard
screws
sealants
staples
steel safety mesh.
Quality requirements incorporate relevant regulations and include:
Australian standards
internal organisational quality policy and standards
manufacturer specifications
workplace operations and procedures.
Installation includes:
employer-approved manual handling techniques
manufacturer recommended methods and fasteners
maintaining specified clearances from recessed luminaires
installing thermal insulation barriers to luminaires and other electrical equipment according to manufacturer's recommendations and applicable standards, including AS/NZS3000:2007
work sequences and fixing processes that minimise waste and maximise material.
Electrical and building regulations may include:
BCA
Australian standards such as:
AS 3999:1992 Thermal insulation of dwellings - Bulk insulation - Installation requirements
AS/NZS 4859.1:2002 Materials for the thermal insulation of buildings - Testing and labelling of insulation
AS/NZS 4200 Pliable building membranes and underlays - reflective foils
AS/NZS 4200.1 Part 1: Materials - reflective foils
AS/NZS 4200.2 Part 2: Installation requirements - reflective foils
AS 1366.1 Rigid cellular polyurethane (RC/PUR) - other insulations
AS 1366.2 Rigid cellular polyisocyanurate (RC/PIR) - other insulations
AS 1366.3 Rigid cellular polystyrene moulded (RC/PS-M) - other insulations
AS 1366.4 Rigid cellular polystyrene - extruded (RC/PS)
AS 4073 Urea-formaldehyde foam thermal insulation - In situ set foam BCA insulation levels - Other insulations.
AS/NZS 3000:2007 (with Amd 1) Wiring Rules, in particular Clause 4.5.2.3.
Materials include:
hazardous materials
non-toxic materials.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the required skills and knowledge specified in this unit.
In particular the person should demonstrate the ability to:
apply knowledge of industry products to identify:
common faults and problems
manufacturer specifications in relation to insulation properties of the available product
manufacturer components and materials
relationships of 'R' rating with BCA and Australian standards' requirements and energy ratings
apply knowledge for the safe installation of thermal insulation in relation to electrical equipment, including:
effects of thermal insulation on cables
wiring likely to be adversely affected by the retrospective installation of thermal insulation
clearance of thermal insulation from recessed downlights and ancillary equipment
complete a risk assessment sheet for each installation which documents:
whether the wiring system is compatible with thermal insulation
number of recess luminaires in ceiling and how the clearances are to be met
electrical hazards, and measures taken to eliminate them
relevant work instructions
communicate and work effectively and safely with others
comply with organisational policies and procedures, including quality requirements
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
follow work instructions, operating procedures and inspection practices to:
maintain workplace records in relation to materials, plant and equipment use
modify work activities to cater for variations in workplace procedures, personnel, contexts and environment
prevent damage to the environment, equipment, products, or site
select and use appropriate PPE
work effectively alone or with others and operate with minimal supervision
select and use non-conductive and insulated tools and materials to minimise electrical hazards
locate, interpret and apply relevant information, standards and specifications
select and install ceiling insulation on at least two occasions within agreed timeframes and standards using safe handling methods for materials and equipment.
Context of and specific resources for assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
This unit is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
ceiling spaces
materials and tools.
Assessment of this unit may be in conjunction with assessment of other units commonly performed at the same time in normal work roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and work roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the required skills and knowledge specified in this unit.
In particular the person should demonstrate the ability to:
apply knowledge of industry products to identify:
common faults and problems
manufacturer specifications in relation to insulation properties of the available product
manufacturer components and materials
relationships of 'R' rating with BCA and Australian standards' requirements and energy ratings
apply knowledge for the safe installation of thermal insulation in relation to electrical equipment, including:
effects of thermal insulation on cables
wiring likely to be adversely affected by the retrospective installation of thermal insulation
clearance of thermal insulation from recessed downlights and ancillary equipment
complete a risk assessment sheet for each installation which documents:
whether the wiring system is compatible with thermal insulation
number of recess luminaires in ceiling and how the clearances are to be met
electrical hazards, and measures taken to eliminate them
relevant work instructions
communicate and work effectively and safely with others
comply with organisational policies and procedures, including quality requirements
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
follow work instructions, operating procedures and inspection practices to:
maintain workplace records in relation to materials, plant and equipment use
modify work activities to cater for variations in workplace procedures, personnel, contexts and environment
prevent damage to the environment, equipment, products, or site
select and use appropriate PPE
work effectively alone or with others and operate with minimal supervision
select and use non-conductive and insulated tools and materials to minimise electrical hazards
locate, interpret and apply relevant information, standards and specifications
select and install ceiling insulation on at least two occasions within agreed timeframes and standards using safe handling methods for materials and equipment.
Context of and specific resources for assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
This unit is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
ceiling spaces
materials and tools.
Assessment of this unit may be in conjunction with assessment of other units commonly performed at the same time in normal work roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and work roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BBB23 | CPCCPB3027 | Install ceiling insulation products | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D401 | CPC31211 | Certificate III in Wall and Ceiling Lining | Qualification |