Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install gaseous agent containers and actuators

Install gaseous agent containers and actuators

Unit of competency
National Code
CPPFES3045
State Code
OCW28
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
20/01/2021
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
039905 - Fire Technology
Original Release Date
01/06/2021
Nominal Hours
45
Description
This unit of competency specifies the skills and knowledge required to receive and install gaseous agent containers, manifold connections, actuators and activating mechanisms at client premises. Gaseous agent containers may contain extinguishing agents which are ozone depleting substances (ODS) and synthetic greenhouse gases (SGG).The unit does not cover any installation, maintenance, replacement or repair functions that are restricted to licensed trades or occupations.A person who has achieved this unit of competency would be expected to take responsibility for organising and completing these tasks with a high degree of self-direction.ODS and SGG are gaseous fire-extinguishing agents listed in Schedule 1 of the Ozone Protection and Synthetic Greenhouse Gas Management Act 1989 and by law, can only be handled by people who hold an appropriate extinguishing agent handling licence (EAHL). This unit supports one or more EAHLs prescribed under the Act. For further information, check with the relevant regulatory authority.
Notes
Elements and Performance Criteria
1 Apply rules and regulations to installation operation.
  • 1.1 Interpret work instructions to clarify types of gaseous agent containers and actuators to be installed, installation timeframes and site location.
  • 1.2 Discuss planned installation procedures with relevant persons to clarify client needs and expectations.
  • 1.3 Plan work activities to prevent ODS and SGG emissions and comply with relevant Australian Standards, ODS and SGG regulations, work health and safety (WHS) and workplace requirements.
  • 1.4 Identify potential and actual breaches of rules and regulations associated with work instructions and take required action to ensure compliance according to regulatory and workplace requirements.
2 Receive system components.
  • 2.1 Check procurement details and specifications of system components and materials against final design documentation and installation drawings.
  • 2.2 Check pre-tested or prefabricated components to ensure they have correct documentation identifying compliance with relevant Australian Standards.
  • 2.3 Conduct quality control checks of materials and components to confirm acceptable condition, and report or rectify identified defects according to workplace requirements.
3 Prepare to install gaseous agent containers and actuators.
  • 3.1 Arrange access to worksite and communicate with responsible entity and affected persons to advise duration and impact of planned installation procedures.
  • 3.2 Identify and control hazards in the work area according to workplace requirements.
  • 3.3 Select and use required materials, tools and equipment, including personal protective equipment (PPE).
  • 3.4 Select and assemble required tools, equipment, materials and hardware components at installation site according to workplace requirements.
  • 3.5 Check cylinders to ensure they contain correct quantities of extinguishing agent according to installation specifications.
  • 3.6 Conduct checks to confirm safety measures are in place prior to the installation process according to workplace requirements.
4 Install gaseous agent containers and actuators.
  • 4.1 Fix support systems, components and fittings according to final design documentation and installation drawings.
  • 4.2 Support containers and fix support frame according to installation drawings and manufacturer requirements.
  • 4.3 Install container manifold and connection components according to manufacturer requirements.
  • 4.4 Remove transport caps, discharge outlet and actuator plugs or caps and locking devices according to manufacturer and workplace requirements.
  • 4.5 Physically check flexible hose connections to ensure they are tight and without kinks.
  • 4.6 Install manual and pneumatic actuators, pilot and slave tubes and fittings safely according to manufacturer and workplace requirements.
  • 4.7 Check pilot and slave tube connections to ensure they are tight and without kinks.
  • 4.8 Set actuators to operate according to manufacturer and regulatory requirements.
5 Finalise installation operation.
  • 5.1 Complete installation documentation according to Australian Standards, manufacturer, regulatory and workplace requirements.
  • 5.2 Check tools and equipment for faults, wear or damage and rectify or report problems according to workplace requirements.
  • 5.3 Leave client premises in a clean and tidy condition.
No information
No information
Replaces
State Code National Code Title Type
WC158 CPPFES3045A Install gaseous agent containers and actuators Unit of competency
State Code National Code Title Type
BGJ7 CPP30821 Certificate III in Fire Protection Inspection and Testing Qualification