Unit of competency Outline

Date retreived
22/07/2026 5:51 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Apply quick changeover procedures

Apply quick changeover procedures

Unit of competency
National Code
MSACMT220A
State Code
W8985
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/09/2008
State Implementation and Classification
Approved Date
16/07/2012
Field of Education
080307 - Organisation Management
Original Release Date
16/07/2012
Nominal Hours
30
Description
This unit covers the knowledge and skills needed to do quick changeovers.
Notes
Elements and Performance Criteria
1. Prepare for changeover
  • 1.1. Determine when changeover will be required
  • 1.2. Obtain all required tools/parts/materials for changeover
  • 1.3. Organise process, and tools/parts/materials ready for changeover
  • 1.4. Identify role of others in quick changeover
2. Make quick changeover
  • 2.1. Plan changeover according to quick changeover principles
  • 2.2. Liaise and work with relevant people in quick changeover
  • 2.3. Complete changeover according to procedures
  • 2.4. Check output meets specification
  • 2.5. Debrief with all relevant stakeholders
  • 2.6. Note any steps which cause a problem
  • 2.7. Recommend changes to problematic steps
3. Improve Occupational Health and Safety (OHS)
  • 3.1. Identify hazards to self or others in all steps/actions
  • 3.2. Determine risks from each hazard
  • 3.3. Identify actions which may be performed in a more ergonomic manner
  • 3.4. Recommend changes to improve OHS

Changeover may refer to an exchange of dies/tools (traditional), or a change between batches, or between campaigns. It may be any quantum equipment/process change to produce a different product.

Changeover is sometimes referred to as

Single-digit set-up: performing a set-up activity in a single-digit number of minutes, i.e. fewer than ten.

OTED: One Touch Exchange of Die; literally, changing a die with one physical motion such as pushing a button; broadly, an extremely simple procedure for performing a set-up activity.

While the term die is the traditional term, competitive manufacturers who require changeover, but where dies are not used or are less significant, have applied this to a range of other changeovers.

This unit may not be applicable to a totally continuous operation producing only the one product, or simultaneous range of products. This is not applicable to a maintenance/ PVI shutdown as experienced by the continuous process manufacturers. However, where there is continuous manufacturing on a campaign basis, it may be applied to the changeover between campaigns or similar changeovers.


Procedures include all work instructions, standard operating procedures, formulas/recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, verbal, computer based or in some other form.

For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Good Manufacturing Practice (GMP), Responsible Care) and government regulations.

Overview of assessment requirements
The person will effectively and routinely carry out quick changeovers, in liaison with other relevant personnel, and will make recommendations for improving the changeover.

What are the specific resource requirements for this unit?
Access to an organisation using quick changeovers.

What critical aspects of evidence are required to demonstrate competency in this unit?
Evidence of routine positive participation in quick changeover.

In what context should assessment occur?
Assessment will need to occur in an organisation using quick changeover or a suitable simulation, for example, in a workshop.

Are there any other units which could or should be assessed with this unit or which relate directly to this unit?
This unit may be assessed concurrently with relevant technical process units.
This unit is related to:

What method of assessment should apply?
Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria, skills and knowledge. A holistic approach should be taken to the assessment.
Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit.
The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace.
The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment.

What evidence is required for demonstration of consistent performance?
Evidence should be available of routinely participating in quick changeovers.

Replaces
State Code National Code Title Type
W2570 MCMT220A Apply quick changeover procedures Unit of competency
Replaced By
State Code National Code Title Type
WD499 MSS402020A Apply quick changeover procedures Unit of competency
State Code National Code Title Type
1478 52263 Certificate II in Glass Glazing (Aluminium Windows and Frames) Accredited course