Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply and monitor the ventilation management plan
Apply and monitor the ventilation management plan
Unit of competency
National Code
RIIUND401E
RIIUND401E
State Code
OCD11
OCD11
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
05/03/2021
Field of Education
061301 - Occupational Health And Safety
Original Release Date
05/03/2021
Nominal Hours
80
Description
This unit describes the skills and knowledge required to apply and monitor the ventilation management plan in coal and metalliferous mining. It includes installing, monitoring and maintain ventilation devices, monitoring and reporting on mine ventilation, and scheduling and carrying out inspections, repair and maintenance activities.It applies to those working in supervisory. They generally perform a broad range of operational activities in their area of responsibility and are responsible for monitoring a safe work environment.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to apply and monitor ventilation management plan
- 1.1 Access, interpret and apply ventilation management documentation and confirm work activity is compliant
- 1.2 Identify, clarify and communicate roles and responsibilities to involved personnel according to ventilation management plan
- 1.3 Identify and obtain required resources according to ventilation management plan
2. Apply ventilation management plan
- 2.1 Identify and interpret impact of changes to ventilation system on the mine atmosphere
- 2.2 Apply installation and operation procedures for monitoring systems and equipment according to ventilation management plan
- 2.3 Install, monitor and maintain ventilation control device in ventilation system according to ventilation management plan
- 2.4 Apply procedures for monitoring, recording and reporting on mine ventilation according to ventilation management plan
- 2.5 Adjust mine control devices according to ventilation management plan and site requirements
- 2.6 Collect and report ventilation data according to ventilation management plan and site requirements
- 2.7 Record and report monitoring system data according to ventilation management plan and site requirements
- 2.8 Respond to alarms raised according to ventilation management plan and site requirements
- 2.9 Apply ventilation emergency and evacuation procedures according to ventilation management plan and site requirements
- 2.10 Contribute to systems audit and review requirements within scope of own role and according to site requirements
3. Apply ventilation system maintenance procedures
- 3.1 Schedule and carry out inspections, repair and maintenance activities according to manufacturer specifications and site requirements
- 3.2 Record, report and review maintenance requirements and activities according to ventilation management plan and site requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH728 | RIIUND401D | Apply and monitor the ventilation management plan | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFH2 | RII40420 | Certificate IV in Underground Coal Operations | Qualification |
| BGP9 | RII40320 | Certificate IV in Underground Metalliferous Mining Operations | Qualification |