Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Perform de-inking operations

Perform de-inking operations

Unit of competency
National Code
PPMDIK301
State Code
ODT56
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
10/02/2022
State Implementation and Classification
Approved Date
31/05/2022
Field of Education
030717 - Plant And Machine Operations
Original Release Date
31/05/2022
Nominal Hours
80
Description
This unit of competency describes the skills and knowledge required to prepare for, start up, stabilise and shut down systems for de-inking operations.This unit applies to production operators who perform de-inking operations in a pulp and/or paper manufacturing facility and respond to contingencies that occur working with complex integrated equipment and continuous operations. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare for de-inking operations
  • 1.1 Identify production requirements and specifications to plan system operations and processes
  • 1.2 Identify workplace health and safety hazards, assess risks and determine control measures
  • 1.3 Identify process control points according to production specifications
  • 1.4 Confirm availability of machine supplies
  • 1.5 Select, fit and use personal protective equipment according to job requirements and task to be undertaken
  • 1.6 Communicate production requirements and specifications, workplace health and safety and environmental requirements and operating procedures to relevant personnel
2. Inspect and prepare systems for start-up
  • 2.1 Inspect de-inking and electronic control systems for warning signals or alarms
  • 2.2 Remove isolations according to operating procedures
  • 2.3 Set and confirm operational settings according to production requirements and specifications
  • 2.4 Complete pre-start check-ups and confirm operation of monitoring devices
  • 2.5 Identify and rectify common faults or refer complex faults to specialist technician
3. Start up de-inking system
  • 3.1 Coordinate, communicate and implement start-up procedures for de-inking operations
  • 3.2 Confirm system functions by monitoring plant, equipment and control system and display monitors
  • 3.3 Monitor and adjust systems to rectify variations from specifications
4. Implement and monitor system shutdown
  • 4.1 Coordinate and communicate planned shutdown of de-inking operations to relevant personnel
  • 4.2 Shut down plant or system according to productivity, workplace health and safety and environmental requirements and operating procedures
  • 4.3 Monitor functionality of equipment during shutdown
  • 4.4 Implement isolation requirements according to operating and housekeeping procedures
5. Respond to unplanned shutdown
  • 5.1 Respond to unplanned faults and stoppages according to operating, emergency and workplace health and safety procedures
  • 5.2 Complete shutdown and isolation according to operating procedures
  • 5.3 Locate and rectify cause of unplanned shutdown within area of responsibility
  • 5.4 Communicate shutdown information to relevant personnel
6. Record and report production information
  • 6.1 Record production and quality data and system operation information according to workplace requirements
  • 6.2 Report problems or variations with production, quality and system to relevant personnel