Unit of competency Outline

Date retreived
21/07/2026 11:30 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Apply air dry and polyurethane enamel refinishing materials

Apply air dry and polyurethane enamel refinishing materials

Unit of competency
National Code
AURVTP3012
State Code
WF533
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
17/01/2013
State Implementation and Classification
Approved Date
17/07/2013
Field of Education
030507 - Automotive Vehicle Refinishing
Original Release Date
17/07/2013
Nominal Hours
32
Description
This unit covers the competence required to apply air dry and polyurethane enamel refinishing materials to a variety of vehicle substrates by spray gun application and determine causes and rectification procedures for paint finish faults.Licensing, legislative, regulatory or certification requirements may apply to this unit in some jurisdictions. Users are advised to check with the relevant regulatory authority.
Notes
Elements and Performance Criteria
1. Prepare for work
  • 1.1. Work instructions are used to determine the job requirements, including job sheets, material type, colour, quality and quantity.
  • 1.2. Job specifications are read and interpreted.
  • 1.3. WHS requirements, including personal protection needs, breathing apparatus and full body protection, are observed throughout the work.
  • 1.4. Materials are selected and inspected for quality.
  • 1.5. Hand tooling and safety equipment are identified and checked for operation.
  • 1.6. Procedures are determined to minimise waste material.
  • 1.7. Procedures are identified for maximising energy efficiency while completing the job.
2. Identify paint faults, causes and rectification procedures
  • 2.1. Paint faults are identified according to industry and workplace procedures.
  • 2.2. Paint fault causes are determined according to industry and workplace procedures.
  • 2.3. Rectification procedures are determined according to fault and type of finish material according to industry standard practices and workplace requirements.
  • 2.4. Identification and determination activities are carried out according to industry regulations/guidelines, WHS legislation, and enterprise procedures/policies.
3. Apply air dry and polyurethane enamel refinishing materials by spray gun
  • 3.1. The environment for application of refinishing materials conforms to requirements for temperature, extraction of fumes and cleanliness.
  • 3.2. Refinishing materials are applied at manufacturer/ component supplier recommended intervals using approved methods.
  • 3.3. Refinishing materials are dried using approved methods and equipment.
  • 3.4. Refinishing materials are applied without causing damage to any component or system.
  • 3.5. The finish produced meets specifications for colour, texture, depth and gloss and is contaminant-free.
  • 3.6. Surface refinishing is completed within approved timeframes.
  • 3.7. Application activities are carried out according to industry regulations/guidelines, WHS legislation, and enterprise procedures/policies.
4. Clean up work area and maintain equipment
  • 4.1. Material that can be reused is collected and stored.
  • 4.2. Waste material is removed and disposed of or stored according to statutory and workplace procedure.
  • 4.3. Spray equipment is cleaned as specified by manufacturer/ component supplier and/or workplace policy and procedures.
  • 4.4. Work area is cleaned and inspected for serviceable condition in accordance with workplace procedures.
  • 4.5. Unserviceable equipment is tagged and faults identified in accordance with workplace procedures.
  • 4.6. Operator maintenance is completed in accordance with manufacturer/component supplier specifications and worksite procedures.
  • 4.7. Tooling is maintained in accordance with workplace procedures.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Paint types
Paint types are to include air dry synthetic enamels, enamel additives, two-pack polyurethane acrylic enamels, urethane additives and paint reducers.
Methods
Methods are to include:
spray gun selection, various spraying techniques, drying procedures, paint mixing
polishing and detailing of surfaces.
WHS
WHS requirements are to be in accordance with legislation/regulations/codes of practice and enterprise safety policies and procedures. This may include protective clothing and equipment, use of tooling and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, enterprise first aid, hazard control and hazardous materials and substances.
Personal protective equipment
Personal protective equipment is to include that prescribed under legislation/regulation/codes of practice and workplace policies and practices.
Safe operating procedures
Safe operating procedures are to include, but are not limited to operational risk assessment and treatments associated with vehicular movement, toxic substances, electrical safety, machinery movement and operation, manual and mechanical lifting and shifting, working in proximity to others and worksite visitors.
Emergency procedures
Emergency procedures related to this unit are to include, but are not limited to emergency shutdown and stopping of equipment, extinguishing fires, enterprise first aid requirements and worksite evacuation.
Environmental requirements
Environmental requirements are to include but are not limited to waste management, noise, dust and clean-up management.
Quality requirements
Quality requirements are to include, but are not limited to regulations, including Australian Standards, internal company quality policy and standards and enterprise operations and procedures.
Statutory/regulatory authorities
Statutory/regulatory authorities may include Federal, State/Territory and local authorities administering acts, regulations and codes of practice.
Tooling and equipment
Tooling and equipment may include various spray guns, air pressure regulators, air compressors, spray booths, baking ovens, heating and lighting systems, strainers, masking equipment and safety equipment.
Materials
Materials may include rags, tac rags, cleaning solvents and cleaning materials.
Communications
Communications are to include, but are not limited to verbal and visual instructions and fault reporting and may include worksite specific instructions, written instructions, plans or instructions related to job/task, telephones and pagers.
Information/documents
Sources of information/documents may include:
verbal or written and graphical instructions, signage, work schedules/plans/specifications, work bulletins, memos, material safety data sheets, diagrams or sketches
safe work procedures related to application of air dry and polyurethane enamel refinishing materials
regulatory/legislative requirements pertaining to automotive painting and finishing
engineer's design specifications and instructions
organisation work specifications and requirements
instructions issued by authorised enterprise or external persons
Australian Standards.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that competence is fully observed and there is ability to transfer competence to changing circumstances and to respond to unusual situations in the critical aspects of:
observing safety procedures and requirements
communicating effectively with others involved in or affected by the work
selecting methods and techniques appropriate to the circumstances
completing preparatory activity in a systematic manner
preparing air dry and polyurethane enamel paint
applying a range of air dry and polyurethane enamel refinishing materials
identifying paint faults and determining rectification faults
rectifying faults
applying environmental procedures.
Context of, and specific resources for assessment
Application of competence is to be assessed in the workplace or simulated worksite.
Assessment is to occur using standard and authorised work practices, safety requirements and environmental constraints.
Assessment is to comply with regulatory requirements, including Australian Standards. The following resources should be made available:
workplace location or simulated workplace
materials relevant to application of air dry and polyurethane enamel refinishing materials
equipment, hand and power tooling appropriate to application of air dry and polyurethane enamel refinishing materials
activities covering mandatory task requirements
specifications and work instructions.
Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the automotive industry's RS&R Training Package.
Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge.
Assessment must be by direct observation of tasks, with questioning on underpinning knowledge and it must also reinforce the integration of key competencies.
Assessment may be applied under project related conditions and require evidence of process.
Assessment must confirm a reasonable inference that competence is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
It is preferable that assessment reflects a process rather than an event and occurs over a period of time to cover varying quality circumstances. Evidence of performance may be provided by customers, team leaders/members or other persons subject to agreed authentication arrangements.
Competence in this unit may be assessed in conjunction with other functional units which together form part of the holistic work role.
Guidance information for assessment
Replaces
State Code National Code Title Type
W5215 AURV329603DA Apply air dry and polyurethane enamel refinishing materials Unit of competency
Replaced By
State Code National Code Title Type
AWZ45 AURVTP012 Apply air dry and polyurethane refinishing materials Unit of competency