Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Implement and amend daily train plan
Implement and amend daily train plan
Unit of competency
National Code
TLIL4075
TLIL4075
State Code
AVI53
AVI53
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
40
Description
This unit involves the skills and knowledge required to control daily train operations in accordance with workplace procedures and the requirements of relevant safeworking regulations and codes of practice.It includes implementing daily train movements, monitoring and making amendments to the daily train plan as required, and maintaining required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work involves the application of routine operational principles and procedures when planning and implementing daily train operations across a variety of operational workplace contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Implement daily train plan
- 1.1 Rail traffic movements are checked to ensure they are achievable in accordance with daily train plan and organisational procedures
- 1.2 Hazards are identified, risks assessed and control measures implemented
- 1.3 Resources are confirmed in accordance with daily train plan and workplace procedures as required
- 1.4 Required train notices and instructions are prepared and issued in accordance with daily train plan and organisational procedures
2 Amend daily train plan
- 2.1 Status of daily train plan is determined based on proposed rail traffic movements and track possessions/works
- 2.2 Daily train plan is amended, as required, to accommodate other rail traffic movement priorities
- 2.3 Contingency plans are developed in accordance with organisational procedures
- 2.4 Information relating to rail traffic movement within the area of control is obtained and analysed
- 2.5 Amendments to daily train plans are received, validated and applied in accordance with organisational procedures
- 2.6 Resources to implement planned rail traffic movements and contingency plans are identified in accordance with organisational requirements
- 2.7 Documentation is amended, compiled and recorded in accordance with organisational policies and procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S8314 | TLIL4075A | Implement and amend daily train plan | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWV7 | TLI42215 | Certificate IV in Rail Network Control | Qualification |
| BHG6 | TLI40921 | Certificate IV in Rail Network Control | Qualification |
| BFV5 | TLI40120 | Certificate IV in Rail Network Control | Qualification |