Unit of competency Outline
Date retreived
23/07/2026 7:31 PM AWST
23/07/2026 7:31 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Lay up and cut complicated fabrics and lays
Lay up and cut complicated fabrics and lays
Unit of competency
National Code
LMTCL3005B
LMTCL3005B
State Code
W7171
W7171
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
27/02/2009
Field of Education
030107 - Garment Making
Original Release Date
27/02/2009
Nominal Hours
30
Description
This unit covers the skills and knowledge to lay up and cut complicated fabrics and lays.
Notes
Elements and Performance Criteria
1 Prepare workstation
- 1.1 Cutting table and seating are set up according to OHS practices and specifications for work.1.2 Equipment is set up and checked.1.3 Routine maintenance of cutting equipment is undertaken.1.4 Cutting table is prepared to suit lay length.
2 Lay up fabric
- 2.1 Lay-up instructions are interpreted.2.2 Fabric is collected and checked off according to OHS practices.2.3 Fabric width and quality are checked against lay-up instructions.2.4 Fabric is laid up, spread and fabric tension is adjusted to suit fabric performance.2.5 Fabric is checked for faults and required action is taken.2.6 Lay height and position of fabric are checked according to cutting equipment and work specifications.2.7 Aids to assist lay-up are used according to job card and workplace practices.
3 Cut work
- 3.1 Fabric is cut to lay, using cutting equipment according to requirements for operation.3.2 Cut work is inspected, any faults identified and appropriate action taken to ensure cut pieces meet required quality standards.3.3 Preventative action to avoid any recurrence of defective pieces is taken and recorded.3.4 Performance of cutting equipment is regularly checked for signs of faulty operation, including evidence from inspection of cut pieces and any required action is taken.3.5 OHS practices are followed to eliminate risks to personal safety.
4 Complete work
- 4.1 Work is bundled according to job card.4.2 Cut work is directed to next operation and work area is cleaned and prepared for next job.4.3 Master copy of lay marker is stored in filing drawer or computer as appropriate.
RANGE STATEMENT
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Legislative/regulatory requirements
All work must comply with relevant Federal and State or Territory legislative or regulatory requirements.
OHS practices
OHS practices include hazard identification and control, risk assessment and implementation of risk reduction measures specific to the tasks described by this unit, and may relate to:
manual handling techniques
standard operating procedures
personal protective equipment
safe materials handling
taking of rest breaks
ergonomic arrangement of workplaces
following marked walkways
safe storage of equipment
housekeeping
reporting accidents and incidents
environmental practices
Equipment may include:
Lay-up equipment:
weights
clamps
spreading table
Cutting equipment:
round blade cutter
straight knife cutter
drills
metal die
computerised cutting machine
Equipment set-up and check includes:
cleaning, checking for faults and assessing servicing against manufacturer instructions
positioning of cutting table
changing cutting blades
Routine maintenance includes:
changing blades, drill bits on cutting equipment
Lay-up instructions may be according to:
job cards, cutting orders, customer order breakdown
marker
Required action taken includes:
splicing (overlap joining) or other appropriate techniques
avoiding the fault
Aids to assist lay up include:
layering with calico or paper for delicate or difficult-to-manage fabrics
Fabric may include:
wovens such as:
denim
wool suitings
corduroy
satins
chiffon
rayons
knits such as:
polar fleece
double knits
single knits
tricot
Bundled may be
by fabric shade
whole garments
same pattern pieces
with notions (threads etc.)
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Legislative/regulatory requirements
All work must comply with relevant Federal and State or Territory legislative or regulatory requirements.
OHS practices
OHS practices include hazard identification and control, risk assessment and implementation of risk reduction measures specific to the tasks described by this unit, and may relate to:
manual handling techniques
standard operating procedures
personal protective equipment
safe materials handling
taking of rest breaks
ergonomic arrangement of workplaces
following marked walkways
safe storage of equipment
housekeeping
reporting accidents and incidents
environmental practices
Equipment may include:
Lay-up equipment:
weights
clamps
spreading table
Cutting equipment:
round blade cutter
straight knife cutter
drills
metal die
computerised cutting machine
Equipment set-up and check includes:
cleaning, checking for faults and assessing servicing against manufacturer instructions
positioning of cutting table
changing cutting blades
Routine maintenance includes:
changing blades, drill bits on cutting equipment
Lay-up instructions may be according to:
job cards, cutting orders, customer order breakdown
marker
Required action taken includes:
splicing (overlap joining) or other appropriate techniques
avoiding the fault
Aids to assist lay up include:
layering with calico or paper for delicate or difficult-to-manage fabrics
Fabric may include:
wovens such as:
denim
wool suitings
corduroy
satins
chiffon
rayons
knits such as:
polar fleece
double knits
single knits
tricot
Bundled may be
by fabric shade
whole garments
same pattern pieces
with notions (threads etc.)
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Critical aspects of evidence
Demonstrates skills and knowledge to:
prepare cutting table and work before commencing operations
use appropriate lay-up and cutting techniques to match pattern pieces and fabric
use cutting equipment safely and according to manufacturer guidelines
check finished work against job specifications
apply OHS practices in all work operations
maintain accurate records
Consistency in performance
Consistently applies skills and knowledge when:
organising work
completing tasks according to instructions
working systematically with attention to detail
identifying improvements and avoiding damage
using workplace practices
using OHS practices
recording and reporting accidents and incidents
assessing operational readiness of equipment
recognising and adapting to cultural differences in the workplace, including modes of behaviour and interactions
Resource implications
Access is required to real or appropriately simulated situations, including work areas, materials and equipment, and to information on workplace practices and OHS practices.
Context for assessment
Assessment may occur on the job or in an appropriately simulated environment.
Interdependent assessment
This unit may be assessed independently or in combination with other relevant units.
Critical aspects of evidence
Demonstrates skills and knowledge to:
prepare cutting table and work before commencing operations
use appropriate lay-up and cutting techniques to match pattern pieces and fabric
use cutting equipment safely and according to manufacturer guidelines
check finished work against job specifications
apply OHS practices in all work operations
maintain accurate records
Consistency in performance
Consistently applies skills and knowledge when:
organising work
completing tasks according to instructions
working systematically with attention to detail
identifying improvements and avoiding damage
using workplace practices
using OHS practices
recording and reporting accidents and incidents
assessing operational readiness of equipment
recognising and adapting to cultural differences in the workplace, including modes of behaviour and interactions
Resource implications
Access is required to real or appropriately simulated situations, including work areas, materials and equipment, and to information on workplace practices and OHS practices.
Context for assessment
Assessment may occur on the job or in an appropriately simulated environment.
Interdependent assessment
This unit may be assessed independently or in combination with other relevant units.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W6495 | LMTCL3005A | Lay up and cut complicated fabrics and lays | Unit of competency |
| E1453 | LMTPRCL04CA | Lay-up work - 3 | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAX41 | MSTCL3005 | Lay up and cut complicated fabrics and lays | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W382 | LMT40307 | Certificate IV in Clothing Production | Qualification |
| W371 | LMT30507 | Certificate III in Clothing Production | Qualification |