Unit of competency Outline

Date retreived
22/07/2026 9:30 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Apply plaster by projection machine

Apply plaster by projection machine

Unit of competency
National Code
CPCCSP3007
State Code
OCN87
TGA Status
Current
DTWD Status
Approved
Current Release Number
3.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
030717 - Plant And Machine Operations
Original Release Date
01/06/2021
Nominal Hours
32
Description
This unit specifies the skills and knowledge required to apply pre-blended plasters, cement render and acrylic texture materials on various background surfaces using a projection plastering system. It includes application to walls, ceilings, inclined surfaces, sills and arches. A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them, without close supervision.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of unit CPCWHS1001Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare to apply plaster by projection machine.
  • 1.1 Read and interpret work instructions and plan sequence of work.
  • 1.2 Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, and workplace requirements.
  • 1.3 Select and use personal protective equipment (PPE) for each stage of the task.
  • 1.4 Inspect work site, assess hazards and apply risk controls.
  • 1.5 Select tools and equipment, check for serviceability and report any faults.
  • 1.6 Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Prepare work area.
  • 2.1 Mask up and protect area surrounding work area.
  • 2.2 Set up and position mixing pump.
  • 2.3 Clear and clean application area for projection plastering application.
  • 2.4 Place barricades and signage to minimise disruption to application process.
3 Apply materials.
  • 3.1 Conduct prestart checks of projection machine.
  • 3.2 Operate mixing pump to produce material of specified consistency to suit environmental conditions.
  • 3.3 Apply materials using projection plastering machine to achieve specified finish.
  • 3.4 Screed material to thickness specified by Australian Standards.
4 Clean up.
  • 4.1 Clear work area, dispose of materials, and reuse or recycle in compliance with legislation, regulations and codes of practice.
  • 4.2 Clean, check, maintain and store tools and equipment in accordance with manufacturers’ specifications.
No information
No information
Replaces
State Code National Code Title Type
W9550 CPCCSP3007A Apply plaster by projection machine Unit of competency
State Code National Code Title Type
BGD3 CPC31020 Certificate III in Solid Plastering Qualification