Unit of competency Outline

Date retreived
23/07/2026 1:03 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Lay stone

Lay stone

Unit of competency
National Code
CPCCST2004
State Code
OCP60
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040309 - Bricklaying And Stonemasonry
Original Release Date
01/06/2021
Nominal Hours
32
Description
This unit specifies the skills and knowledge required to use a variety of stones to construct stone structures, such as freestanding and garden walls, load bearing structural walls and veneer facing. The unit is suitable for people with basic skills and knowledge who undertake routine stonemasonry work tasks under the direction of more experienced workers.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industrymeets this requirement. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan the work.
  • 1.1 Read and interpret lay stone requirements from current plans, specifications, standards and codes and confirm information with relevant person.
  • 1.2 Source and follow relevant information from workplace safety and environmental documentation and workplace procedures.
  • 1.3 Calculate material quantities for the task using measurements and formulas.
  • 1.4 Clarify job priorities and sequence job tasks in consultation with others on site.
  • 1.5 Identify potential hazards and implement control measures.
  • 1.6 Select and check condition of plant, equipment and tools and report damage or malfunction to relevant personnel.
  • 1.7 Check conformity of materials against the specifications.
2 Prepare for work.
  • 2.1 Select, fit correctly and use personal protective equipment (PPE) appropriate for job.
  • 2.2 Identify structural, construction and finish details of wall.
  • 2.3 Set out and mark position, length and height of wall.
  • 2.4 Sort and blend stone and place in preparation to commence work.
  • 2.5 Mix mortar to colour and consistency and place on mortar board ready for use.
3 Lay stone.
  • 3.1 Lay base stone and fix ties and reinforcing and install drainage, flashing and ties.
  • 3.2 Lay stone to a sequence and maintain face to a set line.
  • 3.3 Lay stone to height maintaining shape, consistent joint size, level and plumb.
  • 3.4 Lay wall capping and clean face of stone wall.
4 Fix stone slabs.
  • 4.1 Prepare existing wall for stone application.
  • 4.2 Mix and apply adhesives, mortar or plaster to job requirements.
  • 4.3 Secure stone with ties or dowels.
  • 4.4 Fix stone level, plumb with even joints.
  • 4.5 Remove excessive mortar or adhesive.
  • 4.6 Clean face of stonework.
5 Clean up.
  • 5.1 Clear the work area, and dispose of, reuse or recycle materials following workplace and environmental requirements.
  • 5.2 Clean tools and equipment, check for serviceability and report damage or faults.
  • 5.3 Store and secure tools and equipment following workplace procedures.
No information
No information
Replaces
State Code National Code Title Type
W9554 CPCCST2004A Lay stone Unit of competency
State Code National Code Title Type
BGE7 CPC32320 Certificate III in Stonemasonry Qualification