Unit of competency Outline
Date retreived
23/07/2026 7:08 AM AWST
23/07/2026 7:08 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install LPG, CNG and LNG electrical control equipment
Install LPG, CNG and LNG electrical control equipment
Unit of competency
National Code
AURTTL010
AURTTL010
State Code
AXA56
AXA56
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
13/07/2016
Field of Education
030505 - Automotive Electrics And Electronics
Original Release Date
13/07/2016
Nominal Hours
30
Description
This unit describes the performance outcomes required to install liquefied petroleum gas (LPG), compressed natural gas (CNG) and liquefied natural gas (LNG) electrical control equipment. It involves identifying and confirming work requirements, preparing for the work, installing LPG, CNG or LNG electrical control equipment, testing the installed equipment, and completing work finalisation processes, including clean-up and documentation.It applies to those working in the automotive service and repair industry. The gas fuel system electrical control equipment includes that of agricultural machinery, forklifts, heavy commercial vehicles, light vehicles or mobile plant machinery.Licensing, legislative, regulatory or certification requirements may apply to this unit in some jurisdictions. Users are advised to check with the relevant regulatory authority.
Notes
Elements and Performance Criteria
1. Prepare to install electrical control equipment
- 1.1 Job requirements are determined from workplace instructions
- 1.2 Electrical control equipment installation information is sourced and interpreted
- 1.3 Installation options are analysed and those most appropriate to the circumstances are selected
- 1.4 Hazards associated with the work are identified and risks are managed
- 1.5 Tools, equipment and materials are selected and checked for serviceability
2. Install electrical control equipment
- 2.1 Electrical control equipment is checked for correct application and components are checked for damage
- 2.2 Electrical control equipment components are installed according to workplace procedures, manufacturer specifications, safety and environmental requirements and relevant Australian standards, and without causing damage to components or systems
- 2.3 Installed electrical control equipment is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures, safety requirements, and relevant Australian standards
3. Complete work processes
- 3.1 Final inspection is made to ensure work is to workplace expectations and system is presented ready for use
- 3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- 3.3 Tools and equipment are checked and stored according to workplace procedures
- 3.4 Workplace documentation is processed according to workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WF431 | AURTTL3010 | Install LPG, CNG and LNG electrical control equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAD8 | AUR32016 | Certificate III in Automotive Alternative Fuel Technology | Qualification |
| BAF8 | AUR40616 | Certificate IV in Automotive Electrical Technology | Qualification |
| BFZ9 | AUR30320 | Certificate III in Automotive Electrical Technology | Qualification |
| BGX3 | AUR40620 | Certificate IV in Automotive Electrical Technology | Qualification |
| BAD3 | AUR30316 | Certificate III in Automotive Electrical Technology | Qualification |