Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Design siphonic stormwater drainage systems

Design siphonic stormwater drainage systems

Unit of competency
National Code
CPCPPS5032
State Code
OCN14
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
27/11/2020
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
10
Description
This unit specifies the skills and knowledge required to design siphonic stormwater drainage systems, determine installation details, and prepare specifications for a range of residential, commercial and industrial buildings.The role involves interaction with architects, builders, suppliers, clients and relevant planning authorities and requires a sound understanding of applicable legislation, standards and codes.The unit requirements are typically carried out by experienced people such as hydraulic design consultants or persons in a supervisory capacity in relation to plumbing services on a new or existing site.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Evaluate design parameters.
  • 1.1 Establish scope of work for siphonic stormwater drainage systems.
  • 1.2 Determine design parameters from relevant statutory and regulatory requirements, codes, plans, specifications and client brief.
  • 1.3 Establish performance requirements considering safety of system users or building occupants.
  • 1.4 Apply sustainability principles and concepts as part of the design process.
  • 1.5 Interpret stormwater design manuals, manufacturer requirements and trade and technical manuals
  • 1.6 Conduct additional research, including a desktop study, to outline design parameters.
  • 1.7 Determine factors that contribute to quality, safety and time efficiency.
  • 1.8 Evaluate siphonic system attributes and conduct cost-benefit analysis, comparing a range of pipe materials and system designs.
2 Plan and detail system components.
  • 2.1 Integrate siphonic stormwater drainage systems with the building structure.
  • 2.2 Calculate volume of roof water and stormwater using approved methods.
  • 2.3 Plan layout of pipework systems including type and location of fittings.
  • 2.4 Calculate pipe size and flow requirements for applications according to stormwater collection requirements.
  • 2.5 Plan pipe supports for applications.
  • 2.6 Specify approved materials and components, jointing methods and installation requirements for siphonic stormwater drainage systems.
3 Design and size systems.
  • 3.1 Design siphonic stormwater drainage systems for applications.
  • 3.2 Calculate catchment areas, determine collection points and size siphonic systems.
  • 3.3 Design and size siphonic stormwater drainage systems using calculations and computer software packages.
4 Prepare documentation.
  • 4.1 Prepare client brief of the preferred design.
  • 4.2 Prepare plans and specification for siphonic stormwater drainage systems.
  • 4.3 Prepare testing and commissioning schedule.
  • 4.4 Produce operation and maintenance manual, including information on how to properly and safely maintain the system.
No information
No information
Replaces
State Code National Code Title Type
WF945 CPCPPS5032A Design siphonic stormwater drainage systems Unit of competency
State Code National Code Title Type
BGB3 CPC50620 Diploma of Hydraulic Services Design Qualification