Unit of competency Outline
Date retreived
23/07/2026 2:05 AM AWST
23/07/2026 2:05 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Perform switching to a switching program
Perform switching to a switching program
Unit of competency
National Code
UEPOPS456
UEPOPS456
State Code
OAG19
OAG19
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
15/05/2019
Field of Education
031301 - Electrical Engineering
Original Release Date
15/05/2019
Nominal Hours
27
Description
This unit involves the skills and knowledge required to perform switching to a switching program.An electricalswitchcan alternate a load between two sources either manually or automatically when sensors detect one of the sources has lost or gained power. A switchis installed where the backup generator is located so that the generator can be used to provide temporary electrical power, as required.Competency in this unit requires the ability to prepare for switching program, carry out switching program, and complete all documentation. Individuals will, in general, work as an operator in, in a power generation facility.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Notes
Elements and Performance Criteria
1 Prepare for switching program
- 1.1 Authorisation is confirmed to perform switching operation with coordinating personnel, in accordance with workplace procedures
- 1.2 Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice and environmental obligations are identified, applied and monitored
- 1.3 Contingency plan is discussed with personnel coordinating switching program, in accordance with workplace procedures
- 1.4 Permits and access requirements are identified prior to program commencement, in accordance with workplace procedures
- 1.5 Documentation is received and checked prior to starting switching program, in accordance with workplace procedures
2 Carry out switching program
- 2.1 Personnel involved in switching program is confirmed and they are directed to switching locations, in accordance with workplace procedures
- 2.2 Communication is established and maintained with personnel coordinating switching program, in accordance with workplace procedures
- 2.3 Access to electrical power generation plant is obtained, in accordance with workplace procedures
- 2.4 Switching program steps are verified before and after each operation, in accordance with workplace procedures
- 2.5 Switching steps are documented upon completion of each operation, in accordance with workplace procedures
- 2.6 Permits are issued, monitored and recorded, in accordance with workplace procedures
- 2.7 Switching program is completed and is recorded, in accordance with workplace procedures
3 Complete documentation
- 3.1 Equipment problems, abnormalities and status are reported, in accordance with workplace
- 3.2 Documentation is updated, in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE432 | UEPOPS456A | Perform switching to a switching program | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODY58 | UEPOPS124 | Perform switching to a switching program | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEB6 | UEP40218 | Certificate IV in ESI Generation - Operations | Qualification |
| BEC3 | UEP50218 | Diploma of ESI Generation - Operations | Qualification |
| BEC0 | UEP40118 | Certificate IV in ESI Generation - Systems Operations | Qualification |
| BEB7 | UEP50118 | Diploma of ESI Generation - Systems Operations | Qualification |
| AD836 | UEPSS00007 | High Voltage Operation - H.V. switching programs | Skill set |
| BEB5 | UEP40618 | Certificate IV in Large Scale Wind Generation - Electrical | Qualification |