Unit of competency Outline

Date retreived
22/07/2026 4:55 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install heritage leadlight and stained glass

Install heritage leadlight and stained glass

Unit of competency
National Code
MSFSL5004
State Code
WI652
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040323 - Glazing
Original Release Date
20/06/2014
Nominal Hours
80
Description
This unit of competency covers installing heritage leadlight and stained glass panels following their conservation.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking glass and glazing work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Identify and plan installation requirements
  • 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to leadlight and stained glass operations are verified and complied with
  • 1.2 Location of the leadlight and stained glass panel to be installed is established, confirmed and clarified with appropriate personnel
  • 1.3 Installation sequence is identified and a work plan is developed
  • 1.4 Tools and equipment required for the installation are identified
  • 1.5 Approval of installation plan is obtained as required by agreed procedures
2 Prepare for installation
  • 2.1 Tools and equipment are positioned and checked prior to use to ensure they are appropriate for the installation, serviceable and in a safe condition
  • 2.2 Inspection of the opening where the panel is to be installed is conducted
  • 2.3 Leadlight and stained glass panel is inspected to ensure its integrity while being installed
  • 2.4 Plans and other documents are positioned to allow for confirmation of the panel structure and placement
  • 2.5 Photographs are taken of the panel for later reference
3 Install the panel
  • 3.1 Panel is installed and placed in position
  • 3.2 Supporting frames are removed from the panel
  • 3.3 Panel structural supports are installed and checked
  • 3.4 Structural damage is identified and noted
  • 3.5 Photographs of process of installation are taken for later reference
4 Finalise and report on the installation
  • 4.1 Installed panel is inspected and damage resulting from the installation is identified and rectified
  • 4.2 Tools and equipment are removed cleaned and stored appropriately
  • 4.3 Removal area is cleaned and rubbish disposed of, as appropriate
  • 4.4 Installation report is prepared and provided, as required
No information
No information
Replaced By
State Code National Code Title Type
OAJ95 MSFDG5004 Install heritage leadlight and stained glass Unit of competency
State Code National Code Title Type
J751 MSF50113 Diploma of Stained Glass and Leadlighting Qualification