Unit of competency Outline

Date retreived
22/07/2026 9:05 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Construct tilt panels on site

Construct tilt panels on site

Unit of competency
National Code
CPCCCO3048A
State Code
WI733
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
17/01/2014
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
20/06/2014
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to work in a team to set up, pour and place concrete tilt panels to form internal and external walls for building structures.The unit includes on-site and prefabricated methods of panel construction. It may also include working with others and as a member of a team.
Notes
Elements and Performance Criteria
1 Plan and prepare.
  • 1.1 Work instructions, work health and safety (WHS) requirements and other information relevant to the work are identified, confirmed and applied for planning and preparation purposes.
  • 1.2 Plant, tools and equipment consistent with job requirements are selected and checked for serviceability, and faults are rectified and reported before work begins.
  • 1.3 Material quantity requirements are identified and calculated according to plans, specifications and quality requirements.
  • 1.4 Materials appropriate to the work application are obtained, prepared, safely handled and located ready for use.
  • 1.5 Environmental requirements are identified for the project according to environmental plans and regulatory obligations.
2 Set out and construct temporary casting bed.
  • 2.1 Appropriate area is selected to construct casting bed according to project requirements.
  • 2.2 Ground is prepared to a flat surface in preparation for the casting bed.
  • 2.3 Casting bed is placed and finished to project requirements.
  • 2.4 Casting bed is coated with bond breaker according to product specifications.
3 Set out and prepare formwork for panel.
  • 3.1 Location and size of tilt panel are set out to requirements of job drawings and specifications.
  • 3.2 Tilt panel edge formwork is prepared, placed and fixed plumb and aligned to specification.
  • 3.3 Bond breaker is applied to casting bed face or casting form face of previous panel to ensure ease of panel separation, according to manufacturer dose and quantity recommendations.
  • 3.4 Form release agent is applied to formwork according to specifications.
4 Place and tie reinforcement and cast-in fittings.
  • 4.1 Reinforcement, accessories and cast-in fittings are checked for conformity with design and engineering specifications.
  • 4.2 Reinforcement, accessories and cast-in fittings are positioned exactly to engineer’s drawings and engineering specifications.
  • 4.3 Reinforcement is tied and/or welded in correct placement according to engineer’s drawings and specifications.
5 Place, finish and cure concrete.
  • 5.1 Concrete is evenly placed and consolidated to specification using approved vibration method.
  • 5.2 Concrete surface is screeded and finished to specification ensuring cast-in fittings are clear.
  • 5.3 Curing process is applied according to specification.
  • 5.4 Bond breaker is applied to casting bed face of previous panel to ensure ease of panel separation.
6 Clean up.
  • 6.1 Clean-up procedures are undertaken on a daily basis according to work site policies and procedures.
  • 6.2 Edge formwork is stripped after the final panel is cast, ensuring no damage to panels.
  • 6.3 Work area is cleared and materials disposed of, reused or recycled according to regulations, codes of practice and job specification.
  • 6.4 Plant, tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
signage and restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working outdoors in warm climates
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to tilt panel construction
relevant Australian standards
safe work procedures relating to tilt panel construction
safety data sheets
signage
verbal, written and diagrammatic instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting work sites.
Tools and equipment:
must include:
edging tools
formwork
hammers
measuring tapes and rules
power drills
power leads
screed boards
shovels
spanners
spirit levels
squares
trowels, including power trowels
vibrators
may include:
air compressors and hoses
mechanical screeds
nail guns
power saws
rakes
saw stools
wheelbarrows.
Quality requirements must include:
internal organisational quality policy and standards
manufacturer specifications where specified
relevant regulations and Australian standards
workplace operations and procedures.
Materials may include:
bond breaker and curing compound
concrete
ferrules
form release agents
lifters
steel bars
steel mesh.
Environmental requirements may include:
clean-up management
dust and noise control
vibration management
waste management.
Tilt panels may include:
blockouts
door and window penetrations
raking edges
water proofing and decorative rebates.
Formwork must include:
bracing
edge form timber
plywood.
Reinforcement components must include:
ligatures
mesh
reinforcement bars and rods.
Cast-in fittings may include:
panel lifters
services and fixtures tied to the reinforcement
structural steel ferrules.
Placing methods for concrete may include:
kibble
pumping equipment
shovelling
tremmies
truck-placed
vibrating
wheelbarrows.
Finishing techniques for concrete may include:
broom finished
brushed
bull float
mechanical trowelling machine
steel trowel
wood float.
Curing may include:
applied moisture
coating with a membrane
curing compound
flooding
plastic sheeting
steam.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by undertaking a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
construct casting bed and formwork box for a minimum of six tilt panels measuring an average of 20 square metres each
construct a minimum of six tilt panels, including a minimum of two of the following tilt panels:
blockouts
door and window penetrations
raking edges
water proofing and decorative rebates
comply with engineering specifications, organisational policies and procedures, and quality requirements during construction of tilt panels
locate, interpret and apply relevant information, standards and specifications relating to constructing tilt panels on site
comply with site safety plans and procedures
safely and effectively operate and use plant, tools and equipment required to construct tilt panels on site
communicate and work effectively and safely with others during each stage of the tilt panel construction process.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaces
State Code National Code Title Type
D7366 CPCCCO3028A Carry out tilt panel construction Unit of competency
Replaced By
State Code National Code Title Type
OAP34 CPCCCO3048 Construct tilt panels on site Unit of competency
State Code National Code Title Type
J784 CPC30313 Certificate III in Concreting Qualification