Unit of competency Outline

Date retreived
23/07/2026 11:12 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Repair or insert water distribution assets

Repair or insert water distribution assets

Unit of competency
National Code
NWP254B
State Code
D1869
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
2.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
14/01/2009
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
14/01/2009
Nominal Hours
30
Description
This unit of competency describes the outcomes required to repair water distribution assets and insert or cut in fittings and valves.
Notes
Elements and Performance Criteria
1Plan and prepare for repairs.
  • 1.1 Determine work requirements and location for repair of assets from specifications and instructions.
  • 1.2 Select and check equipment and tools required to meet safety requirements of task and site.
  • 1.3 Select, fit and use personal protective equipment.
  • 1.4 Advise customers of supply interruption.
  • 1.5 Isolate the work area.
2Repair or insert assets.
  • 2.1 Repair or replace leakages and damaged pipes and fittings according to specifications.
  • 2.2 Carry out internal and external protection of assets to meet specifications.
  • 2.3 Pressurise and check repaired distribution assets to ensure that joints are sound.
3Maintain system hygiene and water quality.
  • 3.1 Store pipes and fittings clear of potential pollutants or damaging substances and remove debris or filling from pipes before use.
  • 3.2 Sterilise fittings and repair materials, disinfect and take samples.
  • 3.3 Keep trench water levels below pipe level.
4Review, record and report work.
  • 4.1 Check, maintain and store equipment, tools and materials according to manufacturer guidelines and organisational procedures.
  • 4.2 Complete workplace records and process as required.
  • 4.3 Restore work site to meet environmental and organisational requirements.
  • 4.4 Determine and report apparent cause of asset failure by visual examination of removed components.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Assets may include:
distribution system pipe work, including:
polyvinyl chloride (PVC)
polyethylene
mild steel cement lined
ductile iron cement lined
cast iron cement lined
asbestos cement
copper
glass reinforced piping
structures, including:
meter pits
maintenance holes
valve chambers
regulators
erosion barriers
head walls
thrust blocks
controlling equipment
Equipment used may include:
hand and power tools
lifting and winching equipment
mechanical excavation equipment
pneumatic and motorised equipment, including:
compressors
pneumatic spades and attachments
motorised cutting equipment
on- and off-road vehicles
portable pumps
leak clamps
communication equipment
breathing apparatus
gas detection equipment
rescue equipment
appropriate personal protective equipment
Fittings may include:
hydrants
sluices
valves
scours
main taps
jointing and repair systems for pipe types, e.g. gibault
tapping bands
tension bands
solvent cement joints
compression ring joints
bolted flanges
electrofusion
butt welding
cathodic protection
Sterilising fittings may include:
air scouring
sterilising pipeline and repair pieces
sampling and testing
scrubbing
flushing
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to conduct repair work on water distribution assets by:
planning work and preparing work site
performing repair tasks according to manufacturer specifications and organisational requirements
ensuring system hygiene and water quality
checking work, restoring work site, storing equipment and completing documentation
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Replaces
State Code National Code Title Type
M1878 NWP254A Maintain water distribution assets Unit of competency
State Code National Code Title Type
D244 NWP20107 Certificate II in Water Operations Qualification