Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Analyse refractory failures
Analyse refractory failures
Unit of competency
National Code
PMCOPS491A
PMCOPS491A
State Code
WA782
WA782
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
28/06/2010
Field of Education
030305 - Materials Engineering
Original Release Date
28/06/2010
Nominal Hours
30
Description
Notes
Elements and Performance Criteria
No information
This unit covers all common types of refractory failures. The failure needs to be recognised and distinguished from other possible causes. Possible causes for the failure also need to be identified, particularly if failure is unexpected/refractory life is shorter than expected.
Investigation involved the collection of evidence, and may require the specifying of appropriate tests and the analysis of plant records and logs.
The report should summarise the nature of the failure, the cause(s), the methods used to determine this cause and the conclusions drawn and recommendations made.
OHS
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence.
Investigation involved the collection of evidence, and may require the specifying of appropriate tests and the analysis of plant records and logs.
The report should summarise the nature of the failure, the cause(s), the methods used to determine this cause and the conclusions drawn and recommendations made.
OHS
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence.
Assessment context and methods
Assessment for this unit of competency will be on appropriate exercises. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations, materials and applications.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this competency unit. Simulation should be based on situations as close to real as possible, and will include 'walk-throughs' of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.
Resource implications
Assessment will require access to several examples of refractory failures for some period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Other assessment advice
It may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
It may be appropriate to assess this unit concurrently with:
PMAOHS100B Follow OHS procedures.
Where the analysis of refractory failure is to occur on site, or in a vessel then competency in the appropriate OHS and/or permit units is also required.
Essential knowledge
basis of various failure modes
organisation of simple testwork programs
make appropriate judgements on results
express these results in report format.
Communicating ideas and information
(1)
Collecting analysing and organising information
(2)
Planning and organising activities
(0)
Working with others and in teams
(1)
Using mathematical ideas and techniques
(1)
Solving problems
(1)
Using technology
(1)
Assessment for this unit of competency will be on appropriate exercises. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations, materials and applications.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this competency unit. Simulation should be based on situations as close to real as possible, and will include 'walk-throughs' of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.
Resource implications
Assessment will require access to several examples of refractory failures for some period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Other assessment advice
It may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
It may be appropriate to assess this unit concurrently with:
PMAOHS100B Follow OHS procedures.
Where the analysis of refractory failure is to occur on site, or in a vessel then competency in the appropriate OHS and/or permit units is also required.
Essential knowledge
basis of various failure modes
organisation of simple testwork programs
make appropriate judgements on results
express these results in report format.
Communicating ideas and information
(1)
Collecting analysing and organising information
(2)
Planning and organising activities
(0)
Working with others and in teams
(1)
Using mathematical ideas and techniques
(1)
Solving problems
(1)
Using technology
(1)