Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan and design tailings management facilities
Plan and design tailings management facilities
Unit of competency
National Code
PMAOPS560
PMAOPS560
State Code
AXM69
AXM69
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
039901 - Environmental Engineering
Original Release Date
05/08/2016
Nominal Hours
70
Description
This unit of competency covers the skills and knowledge required to plan and design tailings management facilities (TMF). It applies where the activities of a metals, minerals or other processing plant produces waste in the form of tailings (e.g. slag and slurry) or wastewater.This unit of competency applies to health, safety and environment (HSE) managers/officers, frontline managers, site managers/officers or those in similar roles who are required to develop risk identification and management strategies (business and environmental) and scope and design tailings disposal management systems and facilities. This unit of competency applies to a person who has the responsibility for the planning and design of a company’s tailings waste management system or the planning and design of tailings-specific disposal sites from the early stage metalliferous processes. This would include the planning and design of an environmental management system focused on continual improvement to review, prevent, mitigate or ameliorate adverse environmental impacts and which will provide for the safe storage and disposal of residual wastes and process residues. This unit of competency applies to early stage metal beneficiation processes, typically associated with aluminium, iron, gold, copper, tin, silver, lead and zinc, and similar processes. The TMF will have deposited material suspended in varying levels of water ranging from slurry (e.g. ‘red mud’), through high slump pastes (e.g. filter cake) to low slump pastes; the focus being sub-aerial deposition (not subaqueous or sea deposition). However, with appropriate contextualisation this unit of competency may be applied to other types of waste deposited in a TMF, including overburden, slag or other solid waste products from later metalliferous processes.No occupational licensing or certification requirements apply to this unit at the time of publication.Some jurisdictions may define requirements for tailings storage facility design, construction and ongoing management. Users should check with the relevant authorities and adhere to any such requirements.
Notes
Elements and Performance Criteria
1 Prepare for work
- 1.1 Identify work requirements
- 1.2 Identify and control work health and safety (WHS) hazards and identify risks to the environment
- 1.3 Coordinate with appropriate personnel, including facility managers and team members
2 Research waste/tailings management requirements
- 2.1 Research and identify the type and volume of waste generated from process operations
- 2.2 Research and identify the type and amount of waste management equipment required
- 2.3 Research and identify specific legislation relevant to tailings storage facility design, construction and ongoing management
- 2.4 Identify any organisational-specific waste management requirements, practices or processes
- 2.5 Search for, and cost out, tailings equipment, resources, development and maintenance requirements
- 2.6 Research waste risk management plans and practices
- 2.7 Research environmental, WHS and community implications to waste management plan and design
- 2.8 Consolidate findings from waste/tailings management requirements, and research and use to inform planning and design considerations
3 Undertake site investigations
- 3.1 Conduct initial site visit to inform the planning and design of TMF requirements
- 3.2 Determine facility needs, including scope for variation (i.e. diurnal and process variations)
- 3.3 Plan contingencies for developing or future situations which may require action to be pre-planned
- 3.4 Adjust initial planning and design plans, as appropriate, to incorporate findings of investigations
- 3.5 Collect samples and information from site visit for further investigation to inform waste management planning and design
- 3.6 Identify key operating personnel, practices and equipment to be considered in the planning and design phase
4 Analyse and assess design criteria
- 4.1 Analyse and assess the design criteria requirements for the type and volume of waste generated from process operations
- 4.2 Analyse and assess the design criteria for the type and amount of waste management equipment required
- 4.3 Analyse and assess design criteria based on the specific legislation required
- 4.4 Analyse and assess design criteria in line with organisational-specific waste management requirements, practices or processes
- 4.5 Analyse and assess tailings equipment, resources, development and maintenance requirements, and cost implications
- 4.6 Analyse and assess risk management plan design criteria
- 4.7 Analyse and assess implications to operational personnel, training needs and human resource requirements
- 4.8 Analyse and assess safety concerns
5 Assist drafting of TMF construction plan
- 5.1 Plan and review tailings management scope
- 5.2 Develop timeline, schedule, milestone dates and time management plan
- 5.3 Develop cost management plan with built-in review and tracking processes
- 5.4 Develop quality management criteria plan with periodic reviews
- 5.5 Develop skill, knowledge, training and human resource requirements with built-in review processes
- 5.6 Develop information generation, distribution and communication plan with structured review of outcomes
- 5.7 Develop risk management plan with risk management strategies, issues registers, opportunities identification and review of outcomes protocols
- 5.8 Develop procurement management plan complete with procurement criteria and requirements, procurement contract management processes and review periods
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WG557 | PMAOPS560A | Plan and design tailings management facilities | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAN5 | PMA50116 | Diploma of Process Plant Technology | Qualification |
| BAM9 | PMA60116 | Advanced Diploma of Process Plant Technology | Qualification |