Unit of competency Outline
Date retreived
22/07/2026 11:04 PM AWST
22/07/2026 11:04 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Inspect and maintain transmission overhead network
Inspect and maintain transmission overhead network
Unit of competency
National Code
UETDRTO004
UETDRTO004
State Code
ODN68
ODN68
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
21/12/2021
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
21/12/2021
Nominal Hours
36
Description
This unit consolidates critical knowledge and skills developed throughout the term of the qualification to inspect and maintain transmission overhead network in the electricity supply industry (ESI).It includes inspection and maintenance of de-energised and isolated transmission overhead network in accordance with workplace requirements.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may also apply under State and Territory legislative and regulatory licensing requirement which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to inspect and maintain transmission overhead network
- 1.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed
- 1.2 Work plan is obtained and confirmed in accordance with workplace requirements
- 1.3 Materials required for work are determined and obtained in accordance with work plan and workplace requirements
- 1.4 Plant, tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
- 1.5 Hazards are identified, risks assessed and control measures identified and applied
- 1.6 Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements
- 1.7 Work permits are received and signed in accordance with workplace requirements
- 1.8 Safety observer role and responsibilities are discussed and confirmed in accordance with workplace requirements
- 1.9 Communication method between the workers and safety observer is determined and confirmed in accordance with workplace requirements
- 1.10 Safe approach distances for the work to be performed are determined and confirmed in accordance with workplace requirements
- 1.11 Worksite is prepared in accordance with the work plan and workplace requirements
- 1.12 Traffic management plan is confirmed as being in place in accordance with workplace requirements
2 Inspect transmission overhead network
- 2.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
- 2.2 Lifting, working at heights and the use of plant, tools and equipment are carried out in accordance with workplace requirements
- 2.3 Hazard control measures are monitored in accordance with workplace requirements
- 2.4 Safety observer is positioned to observe the work in accordance with workplace requirements
- 2.5 Communication methods between workers and safety observer are used in accordance with workplace requirements
- 2.6 Transmission overhead network is inspected in accordance with work plan and workplace requirements
- 2.7 Safe approach distances are maintained when the work is being performed
- 2.8 Incidents or unplanned events are responded to in accordance with workplace requirements
- 2.9 Quality checks of work are undertaken in accordance with work plan and workplace requirements
3 Maintain transmission overhead network
- 3.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
- 3.2 Lifting, working at heights and the use of plant, tools and equipment are carried out in accordance with workplace requirements
- 3.3 Hazard control measures are monitored in accordance with workplace requirements
- 3.4 Safety observer is positioned to observe the work in accordance with workplace requirements
- 3.5 Communication methods between workers and safety observer are used in accordance with workplace requirements
- 3.6 Working earths are installed in accordance with workplace requirements
- 3.7 Transmission overhead network is maintained in accordance with work plan and workplace requirements
- 3.8 Safe approach distances are maintained when the work is being performed
- 3.9 All earths are removed and work permits signed off and transmission overhead network re-energised in accordance with workplan and workplace requirements
- 3.10 Incidents or unplanned events are responded to in accordance with workplace requirements
- 3.11 Quality checks of work are undertaken in accordance with work plan and workplace requirements
4 Complete work and documentation
- 4.1 Completed work is checked for compliance against the work plan and workplace requirements
- 4.2 Incidents or unplanned events are reported in accordance with workplace requirements
- 4.3 Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements
- 4.4 Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements
- 4.5 Surplus materials are returned to storage or disposed of in accordance with workplace requirements
- 4.6 Work records, reports and documentation are completed in accordance with workplace requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBG57 | UETTDRTP99 | Test and verify transmission overhead installations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHB3 | UET40421 | Certificate IV in ESI - Network Systems | Qualification |
| BHB8 | UET30521 | Certificate III in ESI - Transmission Overhead | Qualification |