Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Incorporate structural steel detailing into fabrication and construction project management
Incorporate structural steel detailing into fabrication and construction project management
Unit of competency
National Code
MSATCS503A
MSATCS503A
State Code
S7268
S7268
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
09/12/2009
Field of Education
030701 - Mechanical Engineering
Original Release Date
09/12/2009
Nominal Hours
50
Description
This unit covers the skills and knowledge required to undertake structural steel detailing in a manner consistent with procedures and timelines for fabrication and construction projects. The unit requires knowledge of the roles of architects, engineers, builders and fabricators and the skill to interpret project schedules and timelines and their implications for structural steel detailing.
Notes
Elements and Performance Criteria
1. Demonstrate knowledge of steel construction and fabrication processes and roles
- 1.1. Steel construction stages of design, detailing, fabrication and erection are understood
- 1.2. Major codes and standards relevant to steel construction activities can be identified
- 1.3. Roles and responsibilities of architects, engineers, draftspersons and detailers, fabricators and builders can be explained
2. Determine client requirements for structural steel detailing
- 2.1. Client for structural steel detailing is determined
- 2.2. Contacts for architect, consulting engineer, builder and fabricator are obtained
- 2.3. Project timeline and schedules are obtained and delivery dates for detail drawings determined
- 2.4. Procedures for making requests for further information (RFIs) from designers are agreed
- 2.5. Requirements for attendance at team meetings and site visits are determined
- 2.6. Client requirements in relation to format, number and type of shop and erection drawings and other required detailing information is determined
3. Obtain design information for project
- 3.1. Design information is obtained from architect and consulting engineer
- 3.2. Design information and project schedules are used to assess the scope and complexity of detailing tasks
4. Establish structural steel detailing arrangements for project
- 4.1. Details of structural steel detailing team are communicated to client
- 4.2. Document control procedures including numbering, access, filing and revision and updating approval procedures are established according to enterprise procedures and client requirements
- 4.3. Steel detailing tasks and deadlines are established and checked against construction project schedules
- 4.4. Capabilities of proprietary CAD and steel detailing software for project is assessed and decision is made to use computer based or manual structural detailing methods
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Legislative/regulatory requirements
All work must comply with relevant Federal and State or Territory legislative or regulatory requirements
Client
The term client in this unit refers to the organisation commissioning the production of structural steel detail drawings and will normally be the fabricator of structural steel elements of a construction project. However, depending on the project the client may vary and could be the consulting engineer, or in the case of mining projects, it could be the mining company. The client may commission structural steel detail drawing from either internal or external structural steel detailers
Schedules
Schedules may include Gannt charts, contract schedules, lists of contractors, contracted suppliers and any other lists or diagrams relevant to determining the required delivery dates for structural steel detail drawings
Client requirements
Client requirements may include:
shop detail drawings, erection diagrams and material schedules and lists
program and format for CAD files and models
downloading by the structural steel detailer of files direct to client computers and CNC machines
size and number of hard copy drawings
specification of programs and requirements for word processed documents, spreadsheets, presentations, invoices and so on
Design information
Design information is the information provided to the detailer and fabricator by the architects and consulting engineers for a project. For some projects the design information may only be provided by an engineer. The design information will usually be in the form of design drawings or sketches but may also be via material lists and written instructions.
Work environment
Detailing may be undertaken in a variety of work environments including commercial, home office or fabrication or construction enterprise.
Work may be performed individually on a contracting/project basis or as part of a project team and in response to combinations of paper based and electronic instructions.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Legislative/regulatory requirements
All work must comply with relevant Federal and State or Territory legislative or regulatory requirements
Client
The term client in this unit refers to the organisation commissioning the production of structural steel detail drawings and will normally be the fabricator of structural steel elements of a construction project. However, depending on the project the client may vary and could be the consulting engineer, or in the case of mining projects, it could be the mining company. The client may commission structural steel detail drawing from either internal or external structural steel detailers
Schedules
Schedules may include Gannt charts, contract schedules, lists of contractors, contracted suppliers and any other lists or diagrams relevant to determining the required delivery dates for structural steel detail drawings
Client requirements
Client requirements may include:
shop detail drawings, erection diagrams and material schedules and lists
program and format for CAD files and models
downloading by the structural steel detailer of files direct to client computers and CNC machines
size and number of hard copy drawings
specification of programs and requirements for word processed documents, spreadsheets, presentations, invoices and so on
Design information
Design information is the information provided to the detailer and fabricator by the architects and consulting engineers for a project. For some projects the design information may only be provided by an engineer. The design information will usually be in the form of design drawings or sketches but may also be via material lists and written instructions.
Work environment
Detailing may be undertaken in a variety of work environments including commercial, home office or fabrication or construction enterprise.
Work may be performed individually on a contracting/project basis or as part of a project team and in response to combinations of paper based and electronic instructions.
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Demonstrates skills and knowledge to:
identify client and design requirements for a structural steel detailing project
establish structural steel detailing task schedule and timelines and integrate them into the broader project plan and timelines
establish efficient administrative arrangements for liaison with clients and designers
establish drawing and document control procedures
Context of and specific resources for assessment
Assessment may occur on the job or in an appropriately simulated environment
Resource implications for this unit include:
access to real or appropriately simulated detailing of structural steelwork constructions including provision of suitable design information
access to real or simulated fabrication and construction schedules
computer with suitable CAD software or manual drafting equipment and material including work areas, materials and equipment
access to steel and component manufacturers catalogues or web sites
access to relevant standards through either hard copy or internet access.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the Manufacturing Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
Assessment may be applied under project related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency where structural steel detailing is involved
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Demonstrates skills and knowledge to:
identify client and design requirements for a structural steel detailing project
establish structural steel detailing task schedule and timelines and integrate them into the broader project plan and timelines
establish efficient administrative arrangements for liaison with clients and designers
establish drawing and document control procedures
Context of and specific resources for assessment
Assessment may occur on the job or in an appropriately simulated environment
Resource implications for this unit include:
access to real or appropriately simulated detailing of structural steelwork constructions including provision of suitable design information
access to real or simulated fabrication and construction schedules
computer with suitable CAD software or manual drafting equipment and material including work areas, materials and equipment
access to steel and component manufacturers catalogues or web sites
access to relevant standards through either hard copy or internet access.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the Manufacturing Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
Assessment may be applied under project related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency where structural steel detailing is involved
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OEU39 | MEM09227 | Establish structural steel detailing project arrangements | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J367 | MEM50212 | Diploma of Engineering - Technical | Qualification |
| W526 | MSA50108 | Diploma of Manufacturing Technology | Qualification |