Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and maintain rail joints
Install and maintain rail joints
Unit of competency
National Code
TLIB2101A
TLIB2101A
State Code
D4967
D4967
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
07/07/2011
Field of Education
039907 - Rail Operations
Original Release Date
07/07/2011
Nominal Hours
40
Description
This unit involves the skills and knowledge required to install and maintain rail joints in accordance with approved standards, safeworking and regulatory requirements and workplace procedures. It includes identifying and determining parameters or components that require repair, cutting and boring rail, maintaining rail joints, and completing all required documentation. Licensing or certification requirements may be applicable to this unit.
Notes
Elements and Performance Criteria
1Identify and determine parameters or components that require adjustment
- 1.1 Rail joint condition, component, fastening and anchoring defects affecting rail joints are identified in accordance with workplace procedures
- 1.2 Appropriate repair method is selected to ensure rail joint meets specifications
- 1.3 Scope of work is determined and resources are arranged
2Install rail joint
- 2.1 Location of rail joint is determined
- 2.2 Rail is cut and correct rail gap is established for joint type (mechanical or insulated)
- 2.3 Rail ends are bent (if required) in accordance with workplace procedures
- 2.4 Bolt holes are bored to meet joint specification
- 2.5 Joint is assembled to meet specification
3Maintain rail joint
- 3.1 Surfaces and component parts are checked for insulation, lubrication, correct spacing and correct installation in accordance with specifications and work procedures
- 3.2 Rail joint is maintained to specifications following workplace procedures
4Complete documentation
- 4.1 Required documentation is completed in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WA805 | TLIB10109A | Install and maintain rail joints | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| S8267 | TLIB2121A | Maintain rail joints | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W914 | TLI21310 | Certificate II in Rail Infrastructure | Qualification |