Unit of competency Outline
Date retreived
23/07/2026 1:37 AM AWST
23/07/2026 1:37 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Design integrated maintenance management systems
Design integrated maintenance management systems
Unit of competency
National Code
MEM234012
MEM234012
State Code
OEV09
OEV09
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
19/04/2023
Field of Education
030717 - Plant And Machine Operations
Original Release Date
19/04/2023
Nominal Hours
54
Description
This unit of competency defines the skills and knowledge required to systematically design integrated maintenance processes for existing or new plant to complement engineering and business objectives through the maximisation of plant utilisation. It includes consideration of quality aspects, design for reliability and maintainability, and the generation of system data which is analysed and used to aid continuous improvement processes. Design activities can also include reverse engineering and design rectification or modifications of an existing design. The unit is suitable for maintenance personnel and system designers across all areas of manufacturing and engineering who are involved in engineering, manufacturing and related asset maintenance systems, and for those pursuing engineering or related qualifications and careers.Individuals completing this work either already have or are developing skills and experience in maintenance system evaluation, mathematics, mechanical, electrical, fluid and thermal, production methods and processes, materials handling, automated systems, repair techniques, work health and safety (WHS) and risk management.Where the emphasis is on competitive manufacturing-related skills, such as lean manufacturing, reliability centred maintenance (RCM), proactive or total productive maintenance (TPM), and the engineering support is provided by other personnel, then the unit MSS405081 Develop a proactive maintenance strategy should be considered.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Interpret client brief or contract requirements
- 1.1 Determine required features of the integrated maintenance management system
- 1.2 Interpret parameters of the brief or contract
- 1.3 Determine stakeholders to be consulted in design process
- 1.4 Research current maintenance systems and management techniques relevant to brief or contract, including lean systems maintenance, systems thinking, continuous improvement, and constraint and contingency management
- 1.5 Assess WHS regulatory, sustainability or environmental issues relevant to contract or brief
- 1.6 Identify and seek required appropriate technical and professional assistance
- 1.7 Provide initial advice on feasibility based on specified or anticipated operations, including expectations for equipment availability and budget for maintenance
2. Prepare concept proposal
- 2.1 Establish integrated maintenance management system options for plant and plant support services
- 2.2 Establish facilities and service maintenance response system options
- 2.3 Categorise maintainable assets
- 2.4 Establish data collection, storage, analysis and system feedback requirements
- 2.5 Establish personnel participation and development requirements
- 2.6 Carry out required modelling and calculations using appropriate software and validation techniques
- 2.7 Generate solutions in response to the design brief, ensuring conformity with WHS requirements
- 2.8 Determine social and sustainability implications of solutions
- 2.9 Review concept proposals with client to identify most appropriate solution
3. Design and handover integrated maintenance management system
- 3.1 Develop integrated maintenance management system design in line with selected solution
- 3.2 Provide documentation, diagrams, specifications and instructions
- 3.3 Consult with client and stakeholders on features and operation of final design
- 3.4 Obtain sign-off on design in accordance with procedures
- 3.5 Monitor implementation with stakeholders and make any necessary adjustments to design
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S8107 | MEM234012A | Design integrated maintenance management systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BOY9 | MEM80125 | Graduate Diploma of Engineering | Qualification |
| BIW3 | MEM80122 | Graduate Diploma of Engineering | Qualification |