Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Compile mine survey plans
Compile mine survey plans
Unit of competency
National Code
CPPSSI6041
CPPSSI6041
State Code
OCU79
OCU79
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
020115 - Computer Graphics
Original Release Date
01/06/2021
Nominal Hours
60
Description
This unit specifies the skills and knowledge required to compile a mine survey plan using computer-aided design (CAD) programs to produce mine drawings. It includes organising work processes; checking and validating essential surveying information; and creating a survey database, file structures and conventions, and metadata. The unit also includes the use of specialist surveying tools and techniques to measure, reduce and validate spatial data and create mine plans, cross-sections and plots. This unit is suitable for surveyors who use broad theoretical and technical knowledge to analyse information as well as interpret and provide solutions to unpredictable and sometimes complex surveying/spatial information problems. The unit supports those who work in a technical management role in a mining environment.All work must be carried out to comply with workplace procedures, in accordance with relevant state/territory regulations that govern surveying work, as well as work health and safety (WHS) legislation and regulations that apply to the workplace. Cadastral surveying must be undertaken under the supervision of a registered surveyor. Users must check with the relevant regulatory state/territory authority before delivery. Licensing, legislative or certification requirements apply to this unit in some states/territories where mining surveying must be undertaken under the supervision of a registered surveyor. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.
Notes
Elements and Performance Criteria
1 Organise work processes.
- 1.1 Define and document project deliverables, activities and timeframes.
- 1.2 Access and interpret design information to identify spatial data requirements and components to be measured and monitored.
- 1.3 Check essential surveying information for currency and validity.
- 1.4 Create survey database, file structures and conventions, and metadata according to project specifications.
- 1.5 Schedule, measure, record and report progress of activities in relation to agreed timeframes and plans.
- 1.6 Comply with legislative and organisational requirements in compiling mine survey plans.
- 1.7 Implement and maintain agreed communication processes between client and other appropriate persons.
2 Standardise mine survey plan requirements.
- 2.1 Identify requirements for lodging plan according to organisational requirements.
- 2.2 Research and summarise mine plan drawing and plotting requirements to meet project specifications.
- 2.3 Manage contingencies and constraints and resolve problems to ensure plans meet specifications.
3 Produce mine survey plans.
- 3.1 Identify and comply with plan lodgement requirements, standard drawing requirements and plotting specifications.
- 3.2 Check mine grid coordinate systems and requirements for data processing for currency and validity.
- 3.3 Create database, file structures and conventions, and metadata as the basis for design work.
- 3.4 Reduce measured spatial data to project reference system.
- 3.5 Validate and record measurements according to project specifications.
- 3.6 Check mine plans for compliance with project specifications and organisational requirements.
4 Finalise mine survey plans.
- 4.1 Assess plan for compliance with relevant standards and task requirements.
- 4.2 Finalise mine survey plans and notify relevant persons of results according to organisational requirements.
- 4.3 Complete documentation and archive spatial data according to legislative and organisational requirements for completing records, reporting and mine drawings, and protocols for saving and formatting drawings.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXG02 | CPPSIS6041 | Compile mine survey plans | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGJ0 | CPP60121 | Advanced Diploma of Surveying | Qualification |