Unit of competency Outline
Date retreived
22/07/2026 11:26 PM AWST
22/07/2026 11:26 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Produce foil stamped product
Produce foil stamped product
Unit of competency
National Code
ICPPRN262
ICPPRN262
State Code
AUN22
AUN22
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
16/09/2015
Field of Education
030103 - Printing
Original Release Date
16/09/2015
Nominal Hours
30
Description
This unit describes the skills and knowledge required to produce a foil stamped product using a gold blocking or hot foil machine in accordance with product quality standards.It applies to individuals who work under direct supervision but are responsible for preparing materials, monitoring and cleaning equipment and machinery and ensuring the production process is maintained.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Maintain operation of delivery systems
- 1.1 Delivery systems are monitored and adjusted to ensure efficient and continuous operation, without damage to finished product
- 1.2 Substrate is added to and removed from process according to job instructions
2. Maintain production process
- 2.1 Production process is operated in association with fellow workers and according to company specifications and planned daily schedule
- 2.2 If necessary, location of objects into fixtures/jigs is monitored and adjusted
- 2.3 Foil transfer system is monitored and adjusted to ensure quality of printed product meets the approved proof standard
- 2.4 Basic in-line printing/converting/binding/finishing process(es) are monitored and adjusted to ensure quality of product meets the approved proof standard
- 2.5 Production is maintained within work health and safety (WHS) requirements and company and manufacturer’s specifications
- 2.6 Manual and/or automatic control is used as per specification
- 2.7 Performance is monitored and verified using the process control system according to enterprise procedures
- 2.8 Foil performance and position of print are monitored and adjusted throughout production run
- 2.9 Waste is sorted according to enterprise procedures
3. Identify and rectify problems
- 3.1 Production difficulties are anticipated and preventive action is taken to prevent occurrence by timely intervention
- 3.2 Process adjustments to eliminate problems are reported according to enterprise procedures
- 3.3 Faulty performance of equipment is identified and reported according to enterprise procedures
- 3.4 Problems in foil stamping machine operation are identified and reported according to enterprise procedures
- 3.5 Adjustments or corrections are carried out according to specified procedures and consistent with operator’s skill level
- 3.6 Foil stamping machine operation is checked to ensure correct operation
4. Conduct shutdown of production process
- 4.1 Correct shutdown sequence is followed according to manufacturer’s specifications and enterprise procedures
- 4.2 Shutdown is conducted in association with fellow workers and in compliance with WHS requirements
- 4.3 Unused foil is correctly labelled and stored according to manufacturer/supplier specifications and enterprise procedures
- 4.4 Waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures
- 4.5 All product is removed from operating area
- 4.6 Machine faults requiring repair are identified and reported to designated person according to enterprise procedures
- 4.7 Repair/adjustment is verified prior to resumption of operations
5. Clean printing machine at end of print run
- 5.1 Units are cleaned ready for next run
- 5.2 Transportation and delivery systems are disengaged and cleaned ready for next run
- 5.3 Production records or other documentation are accurately completed, where required by enterprise procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D3161 | ICPPR262C | Produce foil stamped product | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFB9 | ICP31320 | Certificate III in Print Binding, Finishing and Packaging | Qualification |
| AZL5 | ICP31315 | Certificate III in Print Manufacturing | Qualification |
| AZO3 | ICP31215 | Certificate III in Printing | Qualification |
| BFB8 | ICP31220 | Certificate III in Printing | Qualification |
| BFC3 | ICP20120 | Certificate II in Printing and Graphic Arts | Qualification |
| AWB3 | ICP20115 | Certificate II in Printing and Graphic Arts (General) | Qualification |
| AVY0 | ICP30715 | Certificate III in Printing and Graphic Arts (Print Finishing) | Qualification |
| AVW9 | ICP30515 | Certificate III in Printing and Graphic Arts (Printing) | Qualification |