Unit of competency Outline
Date retreived
23/07/2026 9:33 PM AWST
23/07/2026 9:33 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Decommission electrical and electromechanical rail signalling from service
Decommission electrical and electromechanical rail signalling from service
Unit of competency
National Code
UEERS0002
UEERS0002
State Code
OBX90
OBX90
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
18
Description
This unit involves the skills and knowledge required to decommission electrical and electromechanical rail signalling from service on rail networks.It includes preparing to withdraw electrical and electromechanical rail signalling from service. It also includes completing disconnection of operating and redundant circuitry, equipment and components; testing of remaining circuitry and equipment; finding and repairing faults; testing of control and indicating equipment; and reporting.Persons achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and comply with relevant codes of practice, rules and/or guidelines.No other licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to decommission electrical and electromechanical rail signalling from service
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified
- 1.2 Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures implemented in preparation for work
- 1.3 Scope of decommissioning is determined from job specifications, design drawings and regulatory requirements
- 1.4 Appropriate safe working person/s is consulted to ensure work is coordinated effectively with others involved on the worksite
- 1.5 Materials needed for the safe disconnection of circuits, equipment and components are obtained in accordance with workplace procedures and checked against job specifications
- 1.6 Tools, equipment and testing devices needed to disconnect circuits, equipment and components are obtained in accordance with workplace procedures and checked for correct operation and safety
2 Withdraw electrical and electromechanical rail signalling from service
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
- 2.2 On-track safe working requirements are complied with in accordance with relevant industry standards and network rules
- 2.3 Inspection is carried out and circuits, equipment and components are checked to ensure they are in accordance with manufacturer and system specifications
- 2.4 Disconnecting, isolating and removal of redundant wiring; the termination of altered wiring; and checking indicators and signal system operation are completed in accordance with network requirements and relevant industry standards
- 2.5 Methods for dealing with unplanned situations are selected on the basis of safety and specified work outcomes
- 2.6 Decommissioning is performed efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
- 2.7 System and design faults are verified using relevant, technical information, fault-finding and diagnostic techniques to identify faulty rail signalling equipment
- 2.8 Faulty rail signalling equipment is replaced, adjusted and secured in accordance with manufacturer specifications and workplace procedures
- 2.9 Control equipment is adjusted, inspected and tested using workplace test procedures and equipment to ensure it operates in accordance with specified industry technical standards
3 Complete decommissioning work and reports
- 3.1 WHS/OHS work completion risk control measures and workplace procedures are followed
- 3.2 System faults are identified and reported for follow-up action in accordance with workplace procedures
- 3.3 Inspection and test results are documented in accordance with workplace procedures and faulty or replaced equipment is tagged and despatched to maintain equipment spares
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC740 | UEENEEN127A | Decommission electrical and electro-mechanical rail signalling from service | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFO2 | UEE41220 | Certificate IV in Electrical - Rail Signalling | Qualification |